PAGE 14 of 53
4.12. Slip Joint Probe Holder
A
Frame Bar
B
Probe Holder Adjustment Knob
C
Latch
D
Swing Arm Knob
E
Yoke
F
Probe Holder Arm Adjustment Knob
G
Probe Holder Arm
H
Arm Clamp Screw
I
Pivot Buttons
4.12.1. Probe Holder Setup
To mount a UT wedge in the probe holder, follow these steps:
1.
Rotate the probe holder adjustment knob and attach probe holder to a
frame bar
(Fig. 54)
.
2.
Use the probe holder adjustment knob to position the probe holder along
the frame bar
(Fig. 55).
F
I
A
C
B
D
E
G
H
Fig. 53
- Slip Joint Probe Holder
Fig. 54
- Attach to frame bar
Fig. 55
- Adjust on frame bar
Fig. 56
- Adjust swing arm
Fig. 57
- Place pivot buttons
Содержание Rotix
Страница 1: ...ROTIX Manual Weld Frame Scanner CE0120 Rev 05 ...
Страница 38: ...PAGE 33 of 53 CE0120 Rev 05 5 3 Four Probe Cantilever Scanning Fig 120 Four probe cantilever scanning ...
Страница 59: ...Jireh Industries Ltd 53158 Range Road 224 Ardrossan Alberta Canada T8E 2k4 780 922 4534 jireh com ...