
PAGE 21 of 53
CE0120 Rev 05
1.
Loosen the knob on the cable management dovetail mount. Slide the mount
onto the dovetail link
(Fig. 78)
.
2.
Once centred on the dovetail link, tighten the cable management’s dovetail
mount knob
(Fig. 79)
.
4.13.2. Cable Management Setup
The cable management is available in a variety of lengths and provides a means of
bundling and protecting cables and hoses that run to the scanner.
1.
Open the cable management. Begin at the tube’s dovetail mount and place
the cabling in the tube
(Fig. 80)
.
2.
Follow the cable placement zipping the tube closed
(Fig. 81)
.
3.
Once the cable is placed the entire length of tube, bring the zipper from the
tubes opposite end, meeting at any point in the middle
(Fig. 82)
.
4.
When necessary, the two zippers may be opened to allow any cables to exit
the tube anywhere between the ends
(Fig. 83)
.
Fig. 80
- Insert cables and hoses
Fig. 81
- Zip up to close
Fig. 82
- Zip opposite end
Fig. 83
- Flexibility
Содержание Rotix
Страница 1: ...ROTIX Manual Weld Frame Scanner CE0120 Rev 05 ...
Страница 38: ...PAGE 33 of 53 CE0120 Rev 05 5 3 Four Probe Cantilever Scanning Fig 120 Four probe cantilever scanning ...
Страница 59: ...Jireh Industries Ltd 53158 Range Road 224 Ardrossan Alberta Canada T8E 2k4 780 922 4534 jireh com ...