![Jetmaster SLOW COMBUSTION Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/jetmaster/slow-combustion/slow-combustion_installation-and-operation-instructions-manual_646292014.webp)
SLOW COMBUSTION FIREPLACE INSTALLATION AND OPERATION INSTRUCTIONS
•
Allow a gap of 10mm to 25mm between brickwork, and all sides of the casing (except for the
bottom). This gap is vital to allow for expanding steel parts while the unit is being used. This
gap is typically filled with the ceramic wool that is prescribed to be used.
NOTE: Alternative building materials and insulation materials is allowed to be used at
the discretion of the builder / architect, provided that all building materials is effectively
protected from the effects of the heat that will be generated. The steel casing will reach
temperatures exceeding 150°C
•
ALWAYS
use a lintel, above the casing.
NEVER
allow the casing to carry any weight of the
brickwork.
•
On the top of the casing, allowance is made for a Ø150mm flue pipe to be fitted onto the unit.
The necessary allowance must be made to allow the flue pipe to be fitted, after the unit was
installed.
•
The casing is manufactured in a rectangular shape. This shape must be maintained during the
building process. The casing must be protected from any damage that will cause it to deform.
Failing to do this, might prevent the frame from fitting properly at the final stage of the
installation.
Fitting the unit
The unit is fitted by sliding it into place, inside the casing.
NOTE: Because of the weight of the unit, help might be required, to prevent personal injury.
Align the guides inside the outer casing, to the guides underneath the unit.
Guide on Unit
Guide inside
outer casing
12
Содержание SLOW COMBUSTION
Страница 1: ...Slow Combustion Fireplace Installation Operation Instructions November 2006 ...
Страница 2: ......