![Jetmaster SLOW COMBUSTION Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/jetmaster/slow-combustion/slow-combustion_installation-and-operation-instructions-manual_646292010.webp)
SLOW COMBUSTION FIREPLACE INSTALLATION AND OPERATION INSTRUCTIONS
Ceiling penetration
The ceiling boards must be protected from the heat that will be generated by the flue pipe. It is
therefore important to comply with the following.
The flue diameter is Ø150mm. An Ø175mm hole must be cut in the ceiling, thus leaving a 12-13mm
gap all round the flue pipe.
The gap is finished neatly by fixing the escutcheon plate to the ceiling, covering the hole.
NOTE: Do not seal the small air gap between the flue pipe and the escutcheon plate.
A gap of 150mm must be left between brandering beams and the flue pipe. Should the gap be less
than 150mm, then added insulation between the flue pipe and the brandering should be provided.
8
Содержание SLOW COMBUSTION
Страница 1: ...Slow Combustion Fireplace Installation Operation Instructions November 2006 ...
Страница 2: ......