![Jetmaster SLOW COMBUSTION Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/jetmaster/slow-combustion/slow-combustion_installation-and-operation-instructions-manual_646292013.webp)
SLOW COMBUSTION FIREPLACE INSTALLATION AND OPERATION INSTRUCTIONS
BUILD IN UNITS
Building in this version of the slow combustion fireplace, requires 3 basic steps:
•
Building in the outer casing
•
Fitting the unit into the outer casing
•
Finishing by fitting the outer frames.
The basic components are depicted below:
NOTE: Installation of a fireplace must be done according to the laws and regulations of each
country.
Building In the casing
The casing of the unit can be build in during the bricking stage of the wall, allowing toe functional
part of the unit to be stored out of harms way.
Standard building techniques can be used to brick the unit in place. Special care must however be
given to the following:
•
Ensure that the casing rests on at least a full brick / lintel run in front, and at the back of the
casing. The casing is not designed to carry the weight of the unit by itself; it relies in the
structural integrity of the brickwork underneath it.
•
A flange is provided at the font of the casing. Ensure that no brickwork, or plaster work
protrudes in front of this flange. Failing to do so will prevent the frame from fitting properly
at the final stage of the installation.
•
The complete casing must be wrapped with ceramic wool. This is to protect brickwork from
excessive heat.
Outer Casing
Unit
Main Frame
Bottom
Frame
11
Содержание SLOW COMBUSTION
Страница 1: ...Slow Combustion Fireplace Installation Operation Instructions November 2006 ...
Страница 2: ......