Step # 7-X
Install the side supports
Locate the four side supports and install them onto each corner of
the game. These may be labeled for North (Blue) and South (Red)
pole. 1 is for left and 2 is for right. For example: S1 is south pole left
side. These can go anywhere, but were originally installed and lined
up in these positions during testing.
Remove the bracket from the game and retain the bolts and nuts.
They will be needed again to secure the permanent bracket.
Check Box When This Step is Complete
Step # 7-V
Jack limit switches
Each jack includes a limit switch so that when it reaches a certain
vertical point, power to the jack is shut off. Note that this design is
to protect the jack from going too high.
WARNING
DO NOT ALLOW THE JACKS TO GO TOO HIGH
Check Box When This Step is Complete
Step # 7-W
INSTALLATION INSTRUCTIONS
Removing the shipping brackets
Check Box When This Step is Complete
Jennison Entertainment Technologies
Snow Down Service Manual
Page 37