When removing the two remaining header panels, be careful of the
acrylic icicles on the bottom. They should be protected by a strip of
foam.
Attaching the header sections to the marquee
Again attach the header marquee to the header cabinet. Some
should hold the piece in place while the other person locates on
installs the bolts. NOTE that the color of the marquee should match
the appropriate side of the cabinet. (Blue goes towards the Blue
stripes and Red goes towards the Red stripes)
Check Box When This Step is Complete
Check Box When This Step is Complete
Step # 6-E
Unwrapping the header marquee section 3 & 4
side 2 electrical
Carefully unwrap the header marquee pieces.
Check Box When This Step is Complete
INSTALLATION INSTRUCTIONS
Step # 6-D
Checking the packaging for any damage
Step # 6-F
Jennison Entertainment Technologies
Snow Down Service Manual
Page 26