Cut the zip tie to the ceiling AC power cord.
WARNING
BE CAREFUL WHEN CUTTING THE ZIP TIE NOT TO
DAMAGE THE AC POWER CORD
Check Box When This Step is Complete
Step # 4-N
Connecting upper cabinet power cables
Plug in the first three pin Molex connector. This is the high voltage
line (Blue / Brown / Yellow-Green) going to the header power
supply.
Step # 4-L
Lifting the header cabinet into place
Locate the electrical connection in the corner of the header. There
are three connections that must be made.
WARNING
IF NEEDED - SEEK HELP OF A THIRD PERSON
Check Box When This Step is Complete
Step # 4-M
Locating the upper cabinet cables
Check Box When This Step is Complete
INSTALLATION INSTRUCTIONS
Jennison Entertainment Technologies
Snow Down Service Manual
Page 21