20
9. Adjustments and maintenance
1 - GREASING
1.
Whilst using the equipment,
grease every day.
2.
The various greasing points are arranged as follows:
1- Drawbar pin
(2)
2- Front shaft of moving floor, left and right side (
1 Left
+
1 Right
)
3- Upper bearings of spreading device (
1 Left
+
1
Right
)
4- Rear shaft of moving floor, left and right side (
1 Left
+
1
Right
)
3.
Regularly oil
hinges and pins which are not fitted with greasers.
GREASING DIAGRAM: