© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 1 2
Section 4
UBA Pro RT/RQ™ Series Banknote Recycler
Disassembly/Reassembly
Front Transport Unit Removal
To remove the Front Transport Unit out of the RQ
Frame Unit, proceed as follows:
1. Remove the two (2) E-rings (Figure 4-56
a
1
&
a
2
), the two (2) Gears (Figure 4-56
b
1
&
b
2
) and
the two (2) Bearings (Figure 4-56
c
1
&
c
2
).
2. Remove the four (4) Screws (Figure 4-57
a
1
through
a
4
).
3. Feed the Harness (Figure 4-58
a
) out through the
hole (Figure 4-58
b
) to remove the Side Frame
Assy. (Figure 4-58
c
).
4. Remove the BV Tray Assy. (Figure 4-59
a
).
5. Feed the Harness (Figure 4-59
b
) out through the
hole (Figure 4-59
c
) to remove the Front Trans-
port Unit (Figure 4-59
d
).
6. Remove the Rotary Guide (Figure 4-59
e
).
Figure 4-56
Figure 4-56
Front Transport Unit Removal
(RQ Frame Unit) 1
a
1
b
1
c
1
a
2
b
2
c
2
Figure 4-57
Front Transport Unit Removal (RQ
Figure 4-57
Front Transport Unit Removal
(RQ Frame Unit) 2
a
1
a
2
a
4
b
a
3
NOTE: For the reassembly, route the
Harness as illustrated in Figure 4-57
b
.
Ensure that the Harness doesn’t get
pinched when opening the Front Transport
Unit.
Figure 4-58
Front Transport Unit Removal (RQ
Figure 4-58
Front Transport Unit Removal
(RQ Frame Unit) 3
a
b
c
Figure 4-59
Front Transport Unit Removal (RQ
Figure 4-59
Front Transport Unit Removal
(RQ Frame Unit) 4
a
d
e
b
f
c
NOTE: For the reassembly, route the
Harness as illustrated in Figure 4-59
f
.
Ensure that the Harness doesn’t get
pinched when opening the Front Transport
Unit.
Содержание UBA Pro RT Series
Страница 10: ...P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD viii THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 195: ...UBA Pro RT RQ Series Banknote Recycler P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD...
Страница 196: ...P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD UBA Pro RT RQ Series Banknote Recycler Issue 4115 SME 01 00...