© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 1 5
Disassembly/Reassembly
UBA Pro RT/RQ™ Series Banknote Recycler
Section 4
TR Worm Gear (Twin) Removal
To remove the TR Worm Gear (Twin) out of the
RQ Frame Unit, proceed as follows:
1. Remove the Gear Assy. (Figure 4-70
a
).
2. Remove the two (2) Bearings (Figure 4-70
b
1
&
b
2
) from the TR Worm Gear (Twin) (Figure 4-70
c
).
Timing Belt Removal (RQ Rear Trans-
port Unit)
To remove the Timing Belts (38-S1.5M-255UVE
and 40-S3M-324CL) out of the RQ Rear Transport
Unit, proceed as follows:
1. Remove the two (2) Pulley Pins (Figure 4-71
a
1
&
a
2
) and the two (2) the Gear Pulleys 2 (Figure
b
1
&
b
2
).
2. Remove the Timing Belt 40-S3M-324CL (Figure
c
).
3. Remove the two (2) E-rings (Figure 4-72
a
1
&
a
2
).
4. Remove the two (2) Pulley Pins (Figure 4-73
a
1
&
a
2
) and the two (2) Pulleys (Figure 4-73
b
1
&
b
2
).
5. Remove the single (1) Pulley Shaft Assy. (Figure
a
).
6. Remove the six (6) Driven Pulley Pins (Figure 4-
a
1
through
a
6
).
7. Remove the six (6) Pulleys (Figure 4-75
b
1
through
b
6
).
8. Remove the two (2) Timing Belts 38-S1.5M-
255UVE (Figure 4-75
c
1
&
c
2
).
Figure 4-70
Figure 4-70
TR Worm Gear (Twin) Removal
(RQ Frame Unit)
a
b
1
2
c
Figure 4-71
Timing Belt Removal (RQ Rear
Transport Unit) 1
a
1
a
2
b
1
b
2
Figure 4-72
Figure 4-72
Timing Belt Removal (RQ Rear
Transport Unit) 2
a
2
Figure 4-73
Figure 4-73
Timing Belt Removal (RQ Rear
Transport Unit) 3
a
1
a
2
b
2
Figure 4-74
Figure 4-74
Timing Belt Removal (RQ Rear
Transport Unit) 4
a
Figure 4-75
Figure 4-75
Timing Belt Removal (RQ Rear
Transport Unit) 5
a
1
a
2
a
3
1
b
2
b
3
a
4
a
5
a
6
b
6
b
4
b
5
c
2
Содержание UBA Pro RT Series
Страница 10: ...P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD viii THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 195: ...UBA Pro RT RQ Series Banknote Recycler P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD...
Страница 196: ...P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD UBA Pro RT RQ Series Banknote Recycler Issue 4115 SME 01 00...