
AAA-055-00012
Jaylor Operator’s Manual
- 38 -
Single Auger Trailer Units
Use a combination of the opening of the unloading door and ground speed to distribute the
feed mixture to the desired areas. Follow this order:
a. Raise the unloading door;
b. Start the auger;
c. Begin driving along feeding area to unload the feed mixture.
4. Monitor scale indicator readings to evaluate ration distribution to unloading areas.
5. Continue unloading until mixing chamber is empty or desired amount of mixed ration has
been unloaded.
Important: It may be necessary, in order to completely empty the mixer of all commodities, to
turn the auger at the fastest speed possible. This will propel the feed that is resting
on the auger off its flighting, and allow the auger to unload this.
6. Unplugging:
Although plugging or clogging of material can occur in several ways, the list identifying ways
for plugging or clogging to occur includes but is not limited to:
a. Unloading door;
b. Return end of conveyor on left/right discharge models.
Always place controls in neutral, stop engine, set park brake, remove ignition key, and wait
for all moving parts to stop before unplugging.
Figure 17 Conveyor Clean Out
Open discharge door or conveyor cleanout boot (if applicable) and clean out the clogged
area. Close and secure the conveyor cleanout boot before starting again.