AAA-055-00012
Jaylor Operator’s Manual
- 22 -
Single Auger Trailer Units
Important: Ensure that there is always sufficient clearance for the PTO shaft to operate without
interfering with the attachment or position of the machine hookup to the drawbar.
Figure 3 - Drawbar Attachment.