Pre-survey Preparation
Charging the Batteries
Power supply requirements
31
www.javad.com
2.4. Charging the Batteries
C
AUTION
:
Risk of explosion if battery is replaced by an incorrect type. Dispose of used battery according
to the instructions.
Before beginning to work, fully charge the batteries for maximum operating time. An
approximately 6-hour charge cycle will fully charge the batteries; the batteries will charge
simultaneously. The batteries can not be overcharged.
Note:
The batteries are shipped from the factory with 40% of power. Fully charge the batteries before
surveying.
The Li-Ion batteries used in the battery packs should run at no less than 80% capacity after 500
charging cycles. These batteries do not need to be drained before recharging.
D
ANGER
:
N
EVER
ATTEMPT
TO
OPEN
THE
CASING
OF
THE
DETACHABLE
BATTERIES
! L
ITHIUM
-I
ON
BATTERIES
CAN
BE
DANGEROUS
IF
MISHANDLED
!
D
ANGER
:
D
O
NOT
INCINERATE
OR
HEAT
BATTERY
PACK
ABOVE
212
DEGREES
FAHRENHEIT
(100
DEGREES
CELSIUS
). E
XCESSIVE
HEAT
CAN
CAUSE
SERIOUS
DAMAGE
AND
POSSIBLE
EXPLOSION
.
D
ANGER
:
T
HE
BATTERIES
(
OR
BATTERIES
INSTALLED
)
SHALL
NOT
BE
EXPOSED
TO
EXCESSIVE
HEAT
SUCH
AS
SUNSHINE
,
FIRE
OR
THE
LIKE
.
Warning:
Do not attempt to open the battery pack.
Warning:
Do not disassemble the battery pack.
Warning:
Do not charge in conditions different than specified.
Warning:
Do not use other than the specified battery charger.
Warning:
Do not short circuit the battery pack.
Warning:
Do not crush or modify the battery pack.
2.4.1. Power supply requirements
The socket-outlet shall be installed near the equipment and shall be easily accessible.
A single external power supply with 5 pin ODU connector or SAE connector is necessary to
operate TRIUMPH-1. If external power supply has only SAE connector, Receiver-to-SAE power
cable shall be used. The external power supply needs to be Listed for US and Certified for EU
Содержание TRIUMPH-1
Страница 2: ...www javad com ...
Страница 14: ...Preface Related Information Technical Assistance 14 www javad com ...
Страница 26: ...Introduction Option Authorization File OAF Storage Precautions 26 www javad com ...
Страница 94: ...Receiver and File Maintenance Loading New Firmware Sleep Mode 94 www javad com ...
Страница 136: ...Configuration Examples RCV RAW Client Configuration Example Rover Configuration 136 www javad com ...
Страница 156: ...UHF Radio Usage 156 www javad com ...