35
UMG 509-PRO
www.janitza.com
INFORMATION
If the main measurement is connected to a
three-phase 3-conductor network, the auxiliary
measurement can no longer be used as a mea-
surement input.
INFORMATION
For measurement with the auxiliary measure-
ment, a voltage must be connected to the main
measurement to determine the frequency.
INFORMATION
Measured voltages and currents must originate
from the same network.
7.7.3
Auxiliary input
L1
L2
L3
N
V
4
N
4w 1m
I
4
S1 S2
L1
L2
L3
V
4
N
3w 1m
I
4
S1 S2
N
PE
V
4
N
2w 1n
I
4
S1 S2
Fig. Measurement in a three-phase 4-conductor
network with a symmetrical load
L1
L2
L3
N
V
4
N
4w 1m
I
4
S1 S2
L1
L2
L3
V
4
N
3w 1m
I
4
S1 S2
N
PE
V
4
N
2w 1n
I
4
S1 S2
Fig. Measurement in a three-phase 3-conductor
network with a symmetrical load
L1
L2
L3
N
V
4
N
4w 1m
I
4
S1 S2
L1
L2
L3
V
4
N
3w 1m
I
4
S1 S2
N
PE
V
4
N
2w 1n
I
4
S1 S2
Fig. Measurement of voltage between N and PE.
Measurement of the current in the neutral conductor
Содержание UMG 509-PRO
Страница 23: ...23 UMG 509 PRO www janitza com...
Страница 27: ...27 UMG 509 PRO www janitza com...
Страница 47: ...47 UMG 509 PRO www janitza com...
Страница 94: ...UMG 509 PRO 94 www janitza com Fig IEC 61000 2 4 Watchdog parameters with traffic light principle report...
Страница 95: ...95 UMG 509 PRO www janitza com Fig IEC61000 2 4 PQ indicator parameters with traffic light principle snapshot...
Страница 107: ...107 UMG 509 PRO www janitza com 15 8 Dimensional drawings Fig Side view Fig Bottom view...
Страница 115: ...115 UMG 509 PRO www janitza com...