Page 24
= Key 1
= Key 2
= Key 3
= Maximum or consumption = Minimum or supply.
Energy determination
Starting time and running time are saved for the follo-
wing real and reactive energy:
Real energy without reverse running stop
Real energy supply
Real energy consumption (T00)
Reactive energy without reverse running stop
Reactive energy ind., (T10)
Reactive energy cap., (T20)
Starting and running time for energy meters, controlled
by internal or external tariff changeovers, are not saved.
Move to the measured
value indication of
reactive energy using
key 3.
M VArh
kVArh
VArh
L1
L2
L3 ind
SELECT
T
Go to select mode using
key 1
.
The symbol
SELECT
is flashing.
Confirm with
key 2
. The
symbol
SELECT
is on.
M VArh
kVArh
VArh
L1
L2
L3 ind
T
Call up the additional
information starting
time for reactive energy
measurement using
key
2
.
Confirm again with
key
2
. The running time for
reactive energy measu-
rement is indicated.
Year=99 Month=09
Day=06 Hour=08
Minute=15
Seconds=41
SELECT
Y.M
D.H
M.S
SELECT
Y.M
D.H
M.S
Days=02 Hours=04
Minutes=15 Seconds=41
The interrogation, for reactive energy ind (T10) for
instance, can be carried out as follows:
Press
key 1
for about 2 seconds and you return to the first
measured value window of the measured value indicati-
on from each program part.