Page 44
= Key 1
= Key 2
= Key 3
= Maximum or consumption = Minimum or supply.
t1
100kW were exceeded, relay K1 attracts.
t2
200kW were exceeded, relay K2 attracts.
t3
200kW were underscored. The programmed
minimum connection time for relay K2 is running.
t4
The minimum connection time is over and the
relay K2 releases.
t5
100kW were underscored. The programmed
minimum connection time for relay K1 is running.
t6
The minimum connection time is over, and relay
K1 releases.
Example: Real power, sequence chart
1234
1234
t1
Ein
K2
K1
Aus
t
Ein
Aus
123
123
t4
t2
t3
t5 t6
P/kW
0
100
200
In menu
CONF
you
leaf to the indication of
the desired
limit group
using
key 3
.
The limit number here
is indicated as
1A
.
Now change over bet-
ween the limit numbers
1A, 1B and 1C
using
key 2
.
M.S
CONF
Assign measured value:
P r e s s i n g
k e y 1 ,
t h e
middle indication is
flashing, and a
mea-
sured value
can be se-
lected.
The text
EDIT
appears.
Pressing
key 2
and then
key 3
you leaf through
the measured value
indications.
A measured value can
be selected using
key 1.
Please confirm with
key
2
.
M.S
CONF
EDIT
kW
M.S
L1
L2
L3
EDIT
CONF
Attention!
To be able to distinguish between the measured
values "Sum real power" and "Real power
EMAX", the phases for "Real power EMAX"
are shown in the first line.
Assign limits
With
key 1
you can
change between the
ciphers of the
limit
, the
minimum connection
time
and the symbols
for
underscoring / ex-
ceeding
.
If you have confirmed the selected measured value with
key 2
, the first number of the middle indication flashes.
Minimum connection
time
Underscoring/
Exceeding
Limit
The selected numbers or symbols can be changed with
the
keys
2 and 3
(see chapter
Edit
).
If the limit is set, please press
key 1
as often as no
numbers flashing any longer.
EDIT
disappears.
With
key 3
you reach the next menu point. The
limit
is
now saved.
Limit group
Example: Sum real power
limit number 2B
A s s i g n e d m e a s u r e d
value= Sum real power.
Switched at exceeding.
Minimum connection
time= 10 seconds
Limit=100kW
kW
M.S
L1
L2
L3
EDIT
CONF
Example: Real power EMAX
Limit number1C
Measured value=
S u m " r e a l p ow e r
EMAX"
Switches, when ex-
ceeded.
Minimum connection
time= 10 seconds
Limit =100kW
kW
M.S
L1
L2
L3
CONF
kW
M.S
L1
L2
L3
CONF