OPERATION 5
en-33
5.11 TOWING / TRAILERING _____________________________________________________
If the mower experiences problems and must be shut
down and removed from the area, it should be loaded
onto a trailer for transport. If a trailer is not available, the
unit can be towed slowly short distances.
NOTE:
Do not exceed 2 MPH (3.2 KPH) while towing.
Long distance towing is not recommended.
Use care when loading and unloading mower. Fasten
mower to trailer to prevent mower from rolling or shifting
during transport.
Before towing, open tow valve. The tow valve permits
moving the mower without starting the engine and
prevents possible damage to hydraulic components.
The tow valve (
Z
) is located on the drive pump beneath
the seat. Remove hardware and tilt seat towards left side
deck.To open valve, use a small wrench to turn the valve
counterclockwise 90°.
The brakes must be manually released to allow the
mower to be moved. Remove access panel in floorboard
and rotate brake release lever to brake release position.
To release the brakes, turn steering wheel for right hand
turn until resistance is felt.
After towing, rotate brake release lever to closed position,
close tow valve completely and make certain seat and
access panel are closed and secured.
Figure 5E
Figure 5F
Normal
Operation
Tow
Position
Z
Normal
Operation
Position
Brake
Release
Position
Содержание R311T-T4I
Страница 63: ...NOTES 11 en 63 11 NOTES ...
Страница 125: ...REMARQUES 12 fr 63 12 REMARQUES ...