112
©2023 J.A. Woollam Co.
M-2000® Hardware Manual
Figure 6-21. Sample Alignment dialog box.
4.
The system will perform an Auto-Z height alignment.
a.
If the Receiver Alignment Camera is installed, Automatic-Camera
becomes an option for fast Sample Height Alignment.
Figure 6-22. Receiver Camera Sample Height Alignment options.
5.
Select
Hardware
>
Controls
>
General
>‘System Check’. Select Yes when
prompted to perform the System Check. Press Ok when asked to mount
the wafer.
6.
In the Sample Alignment dialog box, select Automatic-Quick under the
Sample Height Alignment drop menu. If the calibration wafer has already
been aligned, click ‘Current Position’ to enter the current Z-height. Press
OK. This will take 1-2 minutes. If the System Check is successful, the
system is now ready to take data.
7.
If the Psi and Delta data show a “step” at the Detector Switch Point (for
NIR systems), the Receiver unit may need to have the iris(es) opened up
(shown in Chapter 4). They may have been closed previously to avoid a
detector overload, but with the focusing optics present and off sample,
they can be opened to allow more light into the fiber(s).
Содержание M-2000
Страница 1: ...M 2000 Spectroscopic Ellipsometer Hardware Manual Auto Angle ESM 300 Base CompleteEASE Software...
Страница 2: ...2 2023 J A Woollam Co M 2000 Hardware Manual...
Страница 4: ......
Страница 9: ...M 2000 Hardware Manual 2023 J A Woollam Co ix...
Страница 10: ......
Страница 50: ......
Страница 152: ...152 2023 J A Woollam Co M 2000 Hardware Manual...
Страница 172: ......
Страница 175: ...M 2000 Hardware Manual 2023 J A Woollam Co 175 M 2000V I M 2000X I...
Страница 177: ...M 2000 Hardware Manual 2023 J A Woollam Co 177...