5.
UNPACKING/ASSEMBLY
Check that correct number of components has been supplied, as in figure 1.
Check that the apparatus is complete, undamaged and correctly assembled.
Any damaged or defective parts must be replaced before use.
1. The air fed w welding hood
2. The respiratory protection system (turbo unit + waist belt)
3. Lithium-ion battery
4. The tube, its anti-fire cloth and both end fittings
5. The shoulder harness
6. The air flow tester
7. The lithium-ion battery charger
8. The carrying bag
The package must include:
If any of the above components are not included in your kit, please contact the sup
-
plier immediately.
EN-4
Содержание PANTHER FLOW
Страница 12: ...1 2 3 4 5 6 7 13 12 15 16 17 18 19 20 11 10 9 8 14 9 ALKATR SZ LISTA HU 12...
Страница 28: ...1 2 3 4 5 6 7 13 12 15 16 17 18 19 20 11 10 9 8 14 10 LISTA PIESELOR DE SCHIMB RO 12...
Страница 32: ......
Страница 44: ...1 2 3 4 5 6 7 13 12 15 16 17 18 19 20 11 10 9 8 14 9 PARTS LIST EN 12...
Страница 48: ......