Commissioning protocol PKS 1000
6 720 642 838
(2010/03)
33
11 Commissioning protocol PKS 1000
Customer/responsible for installation:
Installer of installation:
Heat pump type:
Serial number heat pump:
Serial number PKS 1000:
Date of manufacture PKS 1000:
Commissioning date:
Type of heating/cooling system: underfloor heating
fan-assisted radiator
Type of collector:
Total length of collector:
Selected system solution ( Chapter 6.3.1 - 6.3.3): 6.3.1 6.3.2 6.3.3
Other components in the installation:
Additional heat
Room sensor: E11.TT E12.T5 E31.TT E13.TT
Water heater
Exhaust air collector
Three-way change over valve
Hot water sensor T3
Flow line sensor heating circuit 2 E12.T1
Miscellaneous:
Components that must be installed:
Three-way valve, must be installed according to ( Chapter 6.3.1 and 6.3.2)
Room transducer for relative humidity and temperature (dew point sensor) ( Chapter 7.5.2):
E11.TM E12.TM
Dew point monitor with connected humidity sensor ( Chapter 7.5.3)
Number of connected humidity sensors:................
Locations of connected humidity sensors:
The following work has been carried out:
Heating system: filled vented particle filter cleaned minimum flow ensured humidity sensors checked
1)
cooling settings in the control unit checked mixing valve run time changed ( Chapter 9.2)
1) Test the humidity sensor function by moistening it and then checking that the dew point monitor’s red lamp lights.
Fan-assisted radiator: condensation insulation of pipes to/from fan-assisted radiators carried out ® condensation
drain fan-assisted radiator connected and checked
Collector system: filled vented particle filter cleaned vents installed heat transfer fluid concentration
checked
Electrical connection: performed
Tab. 44