background image

4

List of Parts

Front view:

1   Sealing surface
2   Furnace head sealing ring
3   Insulation
4   Thermocouple
5   Firing plate
6   Display
7   Frame plate
8   QTK heating muffle
9   Furnace housing
10   Keypad
11   On/Off switch
12   Heating element fuse
13   Vacuum pump fuse
14   USB-Device interface
15   Fuse holder
16   Power cord
17   Power socket
18   Vacuum pump socket 
19   Rating plate
20   Thermocouple cable
21   Vacuum hose connection
23   Rubber feet
24   Firing plate holder
25   Furnace head housing 
26   Thermocouple plug
27   Plug fuse
28   Heater plug
29   Heater plug socket
30   Thermocouple plug socket
32   Leaf spring
33   Air vents (base)
34   Cooling tray
35   Screw for cooling tray
36   Hood
37   Knurled screw for hood
38   Air vents furnace head
39   Air vents rear panel 
40   Warnings
41   Furnace head mounting mark 
42   Furnace base mounting mark
43   Furnace head mounting
44   Quartz-glass tube
46   Vacuum hose
47   Silicone rest
48  Connecting rod
49  Plug-in console 
 

Содержание Programat CS

Страница 1: ...Operating Instructions Programat CS Valid as of Software Version 3 0...

Страница 2: ...2...

Страница 3: ...key functions 5 3 Basic meaning of the display information 5 4 Program structure 5 5 Adjustable parameters and possible value ranges 5 6 Settings test programs and information 5 7 Explanation of the...

Страница 4: ...20 Thermocouple cable 21 Vacuum hose connection 23 Rubber feet 24 Firing plate holder 25 Furnace head housing 26 Thermocouple plug 27 Plug fuse 28 Heater plug 29 Heater plug socket 30 Thermocouple pl...

Страница 5: ...5 40 25 34 6 10 35 23 47 33 1 7 5 2 3 24 4 8 9...

Страница 6: ...6 20 26 30 29 48 49 27 28 11 32 43 37 39 36 11 38 19 13 12 12 13 15 19 46 21 17 18 16 25...

Страница 7: ...right 80 Cursor key left 81 Information key 82 Program 1 83 Program 2 84 Program 3 85 Program 4 86 Next program 87 Open furnace head 88 Close furnace head 8 4 44 3 100 Programat firing tray 101 Metal...

Страница 8: ...ave the following meanings Risks and dangers Important information Contraindication Burn hazard Risk of crushing The Operating Instructions must be read 1 3 Notes regarding the Operating Instructions...

Страница 9: ...t be observed The instructions regulations and notes in the material s Instructions for Use must be observed The furnace must be operated under the indicated environmental and operating conditions Cha...

Страница 10: ...hazard Never place objects in the firing chamber by hand since there is a burn hazard Always use the tongs accessories supplied for this pur pose Never touch the hot surface of the furnace head as th...

Страница 11: ...original spare parts The temperature range for faultless operation is 5 C to 40 C 41 F to 104 F If the furnace has been stored at very low temperatures or high atmospheric humidity the head has to be...

Страница 12: ...ctronic controls and a software Moreover the set and actual temperatures are continuously compared 3 4 Accessories not part of the delivery form Automatic Temperature Checking Set 2 ATK 2 Programat Ac...

Страница 13: ...Simply use the two corresponding inserts Fold the side flaps 2 and combine the two packaging parts by means of the transportation flaps The packaging may be disposed with the regular household refuse...

Страница 14: ...5 on the firing plate holder 24 Secure the cooling tray 34 with the two screws 35 including the silicone washer 47 Place the cooling tray 34 on the frame plate 7 Make sure that the cooling tray 34 is...

Страница 15: ...nace head mounting Ensure that the furnace head mounting mark 41 is aligned with the furnace base mounting mark 42 Make sure that the firing plate 5 is not damaged by mounting the furnace head Step 4...

Страница 16: ...itional connections Power connection Please make sure that the voltage indicated on the rating plate complies with the local power supply Connect the power cord 16 with the power socket 17 of the furn...

Страница 17: ...with the wall socket 2 Put the On Off switch 11 at the rear of the furnace on position I The furnace will now automatically conduct a self test The performance of all furnace components is automatica...

Страница 18: ...rogram Starting a program is only possible with the furnace head open Start LED 74 Illuminated if a program has been started The LED is blinking while a program is paused STOP key 75 Pressing this key...

Страница 19: ...ration and information 5 5 Adjustable parameters and possible value ranges Symbol Parameter Value range Value range P Program number P 1 20 B Stand by temperature 100 700 C 212 1292 F S Closing time m...

Страница 20: ...by means of the or keys The tune can be set by means of the or keys Enables the pro gramming of the parameters of the currently selected program Settings Renaming Time Date General write protection V...

Страница 21: ...e Ivoclar Vivadent optimized temperature control function With this setting all values and para meters can be reset to the factory settings Attention All individual pro grams which have been created a...

Страница 22: ...fic program two stage program is used The bold line indicates the values for the second stage Furnace head Is shown in the recommendation open area and indicates the most likely action to follow Furna...

Страница 23: ...m Step 1 Select a free program Step 2 Select the parameter list via the setting Programming 7 20 and change the program parameters using the keys After that change back to the Stand by screen by press...

Страница 24: ...e program is used the parameters are displayed for the first and the second stage in a separate screen Switching between the two screens is carried out using the symbol Change program stage indication...

Страница 25: ...lug in connections for correct fit Var external connections weekly Check if the furnace head opens smoothly and without excessive noise Opening mechanism monthly Check if the thermocouple is straight...

Страница 26: ...mend keeping the furnace head closed especially if the temperature drops below 150 C 302 F 7 5 Dehumidification program The condensation of water in the insulation of the firing chamber and the vacuum...

Страница 27: ...o hot to start a firing program start of a firing program 17 System Furnace head cannot 27 The furnace head cannot be moved to the final position It might be blocked by an external mechanical be initi...

Страница 28: ...ales Service if one of the following error messages being displayed 25 29 32 43 44 45 46 47 48 54 56 103 107 700 701 703 704 705 706 707 800 1010 1011 1012 1013 1014 1015 1016 1024 1025 1026 1028 1202...

Страница 29: ...n and off again Has the vacuum already been released Is the program still running Wait until the pro gram is complete Switch furnace off and on again Vacuum pump does not start working Is the vacuum p...

Страница 30: ...120 V Diameter 6 3 x 32 mm 200 240 V Diameter 5 x 20 mm Dimensions of the closed furnace Depth 430 mm width 305 mm 410 mm with Cooling tray Height 320 mm Usable size of the firing chamber Diameter 80...

Страница 31: ...uld correspond to the Software version which is used on your furnace 10 2 Program structure Program Description 1 Crystallization glaze program for IPS e max CAD HT LT 2 Corrective firing for IPS e ma...

Страница 32: ...ga St Rosedale PO Box 303011 North Harbour Auckland 0751 New Zealand Tel 64 9 914 99 99 Fax 64 9 914 99 90 www ivoclarvivadent co nz Ivoclar Vivadent Polska Sp z o o Al Jana Pawla II 78 00 175 Warszaw...

Отзывы: