ThunderION_UM_9752160010_NL_D_GB_F_V2_2
34
4.4.2. Supply voltage
Ensure that the supplymains voltage is correct.
For wiring up to and including 20 m in length (AWG20):
Connect the connector to the bar according to one of the diagrams, see Appendix 1.
Without remote On/Off
With remote On/Off
Position two jumpers on the connector and
connect the supply voltage here:
Connect the supply voltage to pin 1 (24 V)
and pin 6 (0 V)
Pins 1 and 2 (+24 V)
Connect the control voltage to:
Pin 2 (+24 V DC) and pin 5 (0 V)
Pins 5 and 6 (0 V)
For wiring with a length between 20 and 40 m (AWG20):
See appendix 2
4.4.3. External Bar operating OK signaling
It is possible to check the bar's functioning remotely with a PLC, for instance. For this purpose,
an optocoupler output is available on the connector (max. load 30 V DC, 50 mA).
Connect the external signaling to pins 3 and 4 of the connector according to the diagram
(Bar operating OK: see Appendix 1).