Original notice - A1.20
F-RAT-NX75 Technical document
4
2. Procedures from installation to operation
Some errors have been found.
Have the problems been solved?
Prepare the 24V DC power supply, such as DC power supply units.
Prepare control devices, such as PLCs.
Open the package, and check the model, specifications, voltage, etc.
Check accessories.
Advance preparation
Start using only after you have understood all the product’ s functions, safety
information, and precautions.
Read this manual
Product check
Perform maintenance and inspection
based on corresponding parts.
Yes
Maintenance/Inspection
Take appropriate measures based
on the corresponding symptoms.
Troubleshooting
Perform control (programming).
Control
Perform inspection before operation.
Start-up inspection
Run operation.
Install the F-RAT main unit.
Installation
Mount driver cards.
Connect the F-RAT and driver cards.
Connect power and signal cables to driver cards.
Perform settings of driver cards.
Connect to power supply units/PLCs.
Wiring
No
No
Yes
Procedures from
installation to operation
P.15 〜
P.19 〜
P.33 〜
P.35 〜
P.42 〜
P.52 〜
P.55 〜
P.68 〜
Procedures from installation to operation