Original notice - A1.20
7.
Installation/Wiring
33
Installing the
F-RAT main unit
7-2.
Installation
Necessary tools
Carry this product to the installing location.
Check the installing direction for the
loading/discharging sides.
Use the included bolts to secure the unit on
stands or stays with the mounting nuts for
the F-RAT main unit.
Adjust the conveyor frame legs on which the F-RAT main unit has been mounted,
and align levels of the F-RAT main unit and the adjacent conveyor.
13mm
ratchet wrench
13 mm
ratchet wrench
13
Hold the bottom of the main unit
Phillips head screwdriver
(
No.2
)
Precision slotted
screwdriver
Stripper
F-RAT mounting holes
Stay
Dimension W
Dimension L
Mounting example using stays
F-RAT
Conveyor frame
Installing the F-RAT main unit
Installing the F-RAT main unit
1
2
3
4
■
When lifting, hold the bottom of this product.
Do not hold the moving parts, such as
rollers, belt transfer parts, or lifting sections.
■
Check the direction of V-ribbed
pulley.
■
When installing, be careful not to get fingers
caught.
■
Install this product in places with a mounting
surface tilt (inclination) of 0.5% or less.
■
The vibration level in the installation
environment for this product should be 0.5 G
or less.
■
Secure the working space for maintenance
around this product.
■
■
Observe safety regulations required for
installation locations or equipment in use.
■
Install in locations where the weight of this
product and trays can be sufficiently
supported.
(For the main unit weight, refer to P.72)
V-ribbed pulley
Recommended tightening torque:
12 to 15 N·m
F-RAT-NX75 Technical document
Safety precautions
Advance preparation
Product check
Structures
Installation/Wiring
Control/Operation
Maintenance/Inspection
Tr
oubleshooting
Appendix