English
20
Code 1625186897- Edition 7/2019
14.2 COMMAND AND CONTROL PANEL
BEFORE CARRYING OUT THE OPERATION TEST, READ CAREFULLY AND ACQUIRE A
GOOD KNOWLEDGE OF THE COMMAND FUNCTIONS.
NOTICE
Please read instruction manual before usage
Installation of AM-100 can be performed only by professional technicians
Assembling position shall be considered carefully during mechanical installation in order
to ensure good heat dissipation and reduce electromagnetism interferences
Wiring shall be performed respectively according to regulations for heavy and weak
current to reduce electromagnetism interferences
Surge absorber must be communicated with inductive load such as AC contactor of
output control of relay
Output wiring shall be inspected carefully before switch on
Earthing terminal of this body part shall be earthed correctly (the third type of earthing) to
increase product’s capacity of resisting signal noise.
FIG 13
FIG 14
15