OPERATION
69
FIG. 5-25:
Linkage provides three positions of connecting
top link, 1, to Tractor.
For most implements, securing top link, 1, B, is satisfacto-
ry, but position may be varied to provide increased imple-
ment height during transport.
・
Select hole, A, when installing a heavy implement.
・
Select hole C or D for an implement that is used high
off the ground.
FIG. 5-26:
Lift rods, 1, and lower links, 2, also have multi-
ple positions. Normally, lower hole, B, in each lift rod is
attached to forward hole, X, in lower link.
CAUTION: Secure all pins after adjustment is
made. Always use pins supplied with Tractor.
FIG. 5-25
B
2
X
1
A
FIG. 5-26
Содержание TG5330
Страница 1: ...TG5330 TG5390 TG5470 MODELS I S E K I T R A C T O R S ...
Страница 170: ...Wiring Harness Cable Wiring Harness Cable 169 TG5330 5390 5470 STANDARD TYPE ...
Страница 171: ...TG5330 5390 5470 CENTER ROPS TYPE TG5330 5390 5470 170 ...
Страница 172: ...Wiring Harness Cable Wiring Harness Cable 171 TG5330 5390 5470 POWER SHIFT TYPE 1 2 ...
Страница 173: ...172 TG5330 5390 5470 POWER SHIFT TYPE 2 2 TG5330 5390 5470 ...
Страница 174: ...Wiring Harness Cable TG5390 5470 HST TYPE Wiring Harness Cable 173 ...
Страница 175: ...Wiring Harness Cable CABIN SYSTEM For TG5330 5390 5470 Wiring Harness Cable 175 ...