U-MATCH AIR CONDITIONERS MAINTENANCE
146
Disassembly of drainage pump
Remark: Make sure the power supply is cut off before disassembling and protect all the parts during disassembly.
Step Illustration
Handling
Instruction
1. Disassembly of
fastening screws
on seal-plates of
inner panels and
the drainage pipe
Disassemble the fastening
screws on seal-plates of inner
panels and the pump drainage
pipe. Remove the seal-plates.(As
is shown in the graph, the circle
represents fastening screws on
seal-plates and box the fastening
screws on drainage pipe. All the 8
screws shall be disassembled. )
2. Disassembly of
fastening screws
on the drainage
pump
Disassemble the fastening
screws on the dreainage pump.
(As is shown in the graph, the
circle represents the position of
screws.)
3. Removal of
condensed water
drainage pump
Removed condensed water
drainage pump is shown in the
graph.
Disassembly of water-containing plate
Remark: Make sure the power supply is cut off before disassembling and protect all the parts during disassembly.
Step Illustration Handling
Instruction
1. Disassembly of
cover plate
Disassemble the fastening screws on
the cover plate and remove the cover
plate. (As is shown in the graph, circle
represents 6 fastening screws under
the cover plate and the box
represents two fastening screws on
water-containing plate symmetrically
arranged both on left and right.)
2. Disassembly of
water-containing
plate
Disassemble the fastening screws on
the water-containing plate, pull upward
and remove the water-containing plate.
Disassembled water-containing plate is
shown in the graph.
Содержание u-match on/off
Страница 1: ......
Страница 4: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 1 PRODUCT...
Страница 24: ...U MATCH AIR CONDITIONERS PRODUCT 21 5 PIPING DIAGRAM...
Страница 25: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 22 CONTROL...
Страница 26: ...U MATCH AIR CONDITIONERS CONTROL 23 CONTROL 1 OPERATION FLOWCHART 1 1 Cooling Dry Operation...
Страница 27: ...U MATCH AIR CONDITIONERS CONTROL 24 1 2 Heating Operation...
Страница 45: ...U MATCH AIR CONDITIONERS CONTROL 42 5 2 4 Dimensions...
Страница 48: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 45 INSTALLATION...
Страница 91: ...INVENTOR COMMERCIAL AIR CONDITION U MATCH AIR CONDITIONERS 88 MAINTENANCE...
Страница 97: ...U MATCH AIR CONDITIONERS MAINTENANCE 94 Malfunction display E1 Compressor High Pressure Protection...
Страница 98: ...U MATCH AIR CONDITIONERS MAINTENANCE 95 Malfunction display E3 Compressor Low Pressure Protection...
Страница 101: ...U MATCH AIR CONDITIONERS MAINTENANCE 98 Malfunction display E6 Communications Failure...
Страница 107: ...U MATCH AIR CONDITIONERS MAINTENANCE 104 2 ULS 12 WITH FUNCTION OF LOW TEMP COOLING WITHOUT FUNCTION OF LOW TEMP COOLING...
Страница 108: ...U MATCH AIR CONDITIONERS MAINTENANCE 105 3 ULS 18 WITH FUNCTION OF LOW TEMP COOLING WITHOUT FUNCTION OF LOW TEMP COOLING...
Страница 109: ...U MATCH AIR CONDITIONERS MAINTENANCE 106 4 ULS 24 WITH FUNCTION OF LOW TEMP COOLING WITHOUT FUNCTION OF LOW TEMP COOLING...
Страница 111: ...U MATCH AIR CONDITIONERS MAINTENANCE 108 6 ULT36 WITH FUNCTION OF LOW TEMP COOLING WITHOUT FUNCTION OF LOW TEMP COOLING...
Страница 112: ...U MATCH AIR CONDITIONERS MAINTENANCE 109 7 ULT 45 WITH FUNCTION OF LOW TEMP COOLING WITHOUT FUNCTION OF LOW TEMP COOLING...
Страница 115: ...U MATCH AIR CONDITIONERS MAINTENANCE 112...
Страница 163: ......