Invacare SB 400 Скачать руководство пользователя страница 15

Maintenance

4

Maintenance

4.1

Maintenance

A service contract can be made in the countries, where

Invacare®

has

its own sales company. In certain countries Invacare®offers courses
in service and maintenance of the bed. Spare parts lists and additional
user manuals are available from

Invacare®

.

With normal daily use, service must be carried out according to the
check list after two years use and thereafter every second year.

IMPORTANT!

The mattress support must be supported during

service inspections, to prevent accidental lowering.

Only personnel who have received the necessary

instructions or training may perform service and
maintenance of the bed.

After reconditioning the bed, or if bed functions

change, service must be carried out according to the
check list.

Before Use

Ensure that all manual and electrical parts functions correctly
and are in a secure state.

Check, by raising and lowering the bed, that the shear arms run
smoothly in the guideways.

After three months

Ensure that all manual and electrical parts are functioning, and
tighten bolts, screws, nuts, etc.

Every year

We recommend a safety test comprising the motors’
performance and mechanical state.

Every second year

Service should be performed according to the check list.

Motors, hand control and control units

are serviced

by exchanging the faulty part.

4.1.1

Checklist - Maintenance

Checkpoints

q

Circlips, cotter pins and plastic fixing ring - properly locked and
intact.

q

Screws - tightened.

q

Weldings - intact.

q

Side rail locking and moving system - properly locking and
running smoothly.

q

Castor fittings - tightened.

q

Castor brakes - locking properly.

q

Height adjustment motor - running properly.

q

Backrest motor - running properly.

q

Thigh section motor - running properly.

q

Wires - correctly wired and undamaged.

q

Electric plugs - undamaged.

q

Damaged coating - repaired.

q

Line side rail straps - not frayed or cracked.

q

Accessories - correctly assembled and correct function.

q

Rastofix fitting - check function.

q

Motors, control unit and hand control - keep clean from dust
and dirt. Check for damage.

q

Anchor points, cables, piston rod, casing and plugs - Check for
damage.

4.2

Inspection after relocation - Prepare for
new user

IMPORTANT!

When the bed has been relocated; before given to a new
user it has to be thoroughly inspected.

Inspection must be done by a trained professional.

For regular maintenance see maintenance chart.

4.2.1

Checklist - After relocation

Checkpoints

q

Check that the side tubes of the mattress support are fully
inserted, aligned and locked.

q

Check that the latches, locking the mattress support on the
shear arms, are properly engaged (red button on the mattress
support).

q

Check the locking of the motors (pipe pins correctly mounted).

q

Check the electronic wiring for the motors (wires not squeezed).

q

Check that the enclosing of the motors are intact (no cracks
that enables fluids to pierce).

q

Check that the locking cam is properly mounted over the
contacts in the control box.

q

Check the sections of the mattress support by using the hand
control to activate all functions of the moving parts.

q

Check the function of the brakes.

q

Check that the snap locks on the bed ends are properly locked
(pin all the way in = locked)

q

Check the locking function(s) of the side rails.

q

Check that all bed slats are intact and not loose.

4.3

Lubrication

We recommend lubricating the bed according to the following table:

Part of bed

Lubrication method

1 Bearings for lifting- and shear arms

Oil (medically clean)

2 Motor suspension

Oil (medically clean)

3 Motor bearings and Rastofix fitting

Grease

4 Gliding shoes and guideways

Grease

IMPORTANT!

The gliding shoes in the Line side rails´ gliding system
move sluggishly if lubricated with oil.

1581143-A

15

Содержание SB 400

Страница 1: ...Invacare SB 400 en Bed Service Manual DEALER Keep this manual The procedures in this manual MUST be performed by a qualified technician...

Страница 2: ...ission from Invacare Trademarks are identified by and All trademarks are owned by or licensed to Invacare Corporation or its subsidiaries unless otherwise noted This bed has been tested and approved a...

Страница 3: ...th U profiles 11 3 5 Side Rails 12 3 5 1 Scala 2 side rail 12 3 5 2 Britt V and Line side rail 12 3 5 3 Verso ll side rail 12 3 6 Wiring 12 3 7 Mattress retainers 13 3 8 Mattress support extension 13...

Страница 4: ...user manual warnings are indicated by symbols The warning symbols are accompanied by a heading that indicates the severity of the danger WARNING Indicates a hazardous situation that could result in se...

Страница 5: ...uct label is placed on the frame of the bed and contains the following information for your bed Type No Serial No Date of production Manufacturer Name and address Electrical data Degree of protection...

Страница 6: ...nner 3 2 Mattress support Bed parts including mounted motors can be heavy Follow the instructions carefully and if possible be two persons Follow special instructions for two All accessories bed ends...

Страница 7: ...crews under the side tubes on each side of the mattress support 12 Connect all motor plugs to the control box see label on the control box for correct placement Make sure that all motor wires are plac...

Страница 8: ...the bed to the mains 3 2 3 Disassembly of mattress support 2 persons Recommended IMPORTANT Two persons are needed to carry out these instructions Person one in the head end of the bed Person two in t...

Страница 9: ...comes to a stop 9 Tip it gently onto the floor until it stands on the bed end attachments and set it aside 10 Move over to the lower half of the mattress support 11 Pull out the red buttonsL on each s...

Страница 10: ...spacers A and the ends of the shear arms onto the attachments B on the base frame 4 Attach the hi lo motor to the frame with the cotter pin Make sure the clamp is closing properly 5 Put back the cotte...

Страница 11: ...d Risks when using bed end with removable plate If the user is restless confused or has spasms Victoria Bed ends with removable plates must NOT be used Make sure that the side rails are combined with...

Страница 12: ...ntil they have all passed the locking pin D 4 Repeat steps 2 and 3 to mount the other side of the side rail Dismounting 1 Lower the side rail 2 Lift the lower bar in one end to make the locking pin D...

Страница 13: ...ets C on the outer laths Foot end Fold out the mattress retainer B 3 8 Mattress support extension For patients taller than two meters it is recommended to extend the bed with a mattress support extens...

Страница 14: ...the control unit B 2 Connect the cable to the control unit Charging the batteries 1 Connect the control unit to the mains The control unit must be connected to the mains for 24 hours prior to first u...

Страница 15: ...ed and undamaged q Electric plugs undamaged q Damaged coating repaired q Line side rail straps not frayed or cracked q Accessories correctly assembled and correct function q Rastofix fitting check fun...

Страница 16: ...equipment The washability of the components must be determined by authorized personnel If the components cannot withstand Jet base equipment or if it is unclear they have to be cleaned as non washable...

Страница 17: ...lace the control unit Mains indicator lights up but the motor is not running No relay sound is heard from the control unit Hand control is defective Replace the hand control Control unit is defective...

Страница 18: ...andard 41 kg Base frame with central brakes 46 kg 6 2 Dimensions side rails Side rail Measures l length h height Type m mounted r release button Line standard l 206 cm h 40 cm Full length aluminium m...

Страница 19: ...ss A or Class B Electromagnetic environment guidance RF emissions CISPR 11 partly Group I The medical bed uses RF energy only for its internal function Therefore its RF emissions are very low and are...

Страница 20: ...ec Mains power quality should be that of a typical commercial or hospital environment If the user of the medical bed requires continued operation during power mains interruptions it is recommended tha...

Страница 21: ...ed should be observed to verify normal operation If abnormal performance is observed additional measures may be necessary such as reorienting or relocating the medical bed b Over the frequency range 1...

Страница 22: ...Invacare SB 400 These guidelines may not apply in all situations Electromagnetic propagation is affected by absorption and reflection from structures objects and people 22 1581143 A...

Страница 23: ...Notes...

Страница 24: ...353 1 810 7085 ireland invacare com www invacare ie United Kingdom Invacare Limited Pencoed Technology Park Pencoed Bridgend CF35 5AQ Tel 44 0 1656 776 222 Fax 44 0 1656 776 220 uk invacare com www in...

Отзывы: