9.  Self-help in case of failure  

 

Symptom Cause 

Remedy 

No display 

-

 

Jumper (s. section 6.1) not 
inserted  

-

 

Plug in jumper 

-

 

No 24 V voltage supply and 
discharged battery 

 

-

 

Display cable is loose or 
defective  

-

 

Check AC switching power 
supply, recharge battery via 
internal charging switch. * 

-

 

Check display cable or change 

display  

Battery operating mode 
display 

-

 

Power failure 

-

 

24 V Switching power supply is 
not connected 

-

 

24 V Switching power supply is 
defective  

 

-

 

Wait for power to come back on 

-

 

Connect AC switching power 

supply 

-

 

Change AC switching power 

supply 

Display after power failure   

-

 

Display (for 30 seconds) after 
power failure of 24 V voltage 
supply 

 
 

 

-

 

Check the number of failures in 

status mode in a period of 24 h, 
for instance. If the number 
increases and the reason is not a 
general power failure, then the 
power supply is to be checked.  

Display after power failure  

-

 

Display with power failure 
during pump cycle  

 

 

 

-

 

Check pumps via test menu. If 

there is a power failure even in 
test mode, then check for defect 
in respective pump or power 
supply.  

Less clear water running 

into clear water tank  

-

 

Defective suction pump 

-

 

Check suction pump in test 

mode and change if necessary 

 

-

 

Incorrectly installed float 
switch BR min or Cl max or 
defective 

-

 

Check the position and function 

of float switch and change if 
necessary  

Low operating life of 
Membrane(s) 

-

 

Backflushing pump does not 
flush the membrane regularly 
 

-

 

Leakage clogs the membrane 
fibres  

-

 

Check backflushing pump in 

test mode (see. start-up 
process) and change if 
necessary 

-

 

Perform leakage test (see. 

section 8) and remove source 
of leak if necessary  

Display failure 

-

 

Display crashed - for instance, 
by voltage surge in power 
supply (lightning)   or 
electrostatic effect 

Note: The program runs 
normally in future. 

-

 

Restore the display function by 

RESET (adjusted parameters are 
lost) or disconnect the cable 
bridge (s. section 6.1) on 
control board. 

*  Note: 

If the battery voltage does not reach more than 8.5 Volt (see. Status display) after a charging period of 
approx. 14 h, then the battery needs to be replaced.

 

Содержание AL-MS

Страница 1: ...AL MS AQUALOOP Membrane station and controller Installation and operating instructions Water we re in our element www intewa de...

Страница 2: ...enu 4 Test menu 15 Menu 5 Status overview 15 Menu 6 Setting time 16 Menu 7 8 Start time T1 and T2 16 Menu 9 Number of pump intervals A1 A2 16 Menu 10 Blower times and intervals 17 Menu 11 Chemical cle...

Страница 3: ...OOP components along with their application examples and the operational dimensioning of each AQUALOOP component related to treatment water quality and required tank volume for the bioreactor and clea...

Страница 4: ...tion as well as the circuitry comply with the basic safety and health standards of EC guidelines for machines This declaration of validity lapses with any modification of electronic components not app...

Страница 5: ...seal 4 Central aeration pipe with 2 pc flat seals 5 2 pc stainless steel wheel weight 6 Aeration distribution nozzle incl 5 pc closing caps each with flat seal 7 DC switching power supply incl network...

Страница 6: ...n contact Clear water tank MAX CL max Floating switch normally open contact Clear water tank MIN CL min Pot free contact alternative Potential free signal output Clear water tank MIN CL min OUT Signal...

Страница 7: ...6 Fig Dimensions of controller with DC switching power supply Front and top view Fig Dimensions of Membrane station lateral and top view...

Страница 8: ...7 6 Instructions for controller 6 1 Electronic connections Fig Electrical connections of control board and assigning cable routings cable bridge...

Страница 9: ...C 50 Hz blower PE Green yellow N blue L brown 11 230V Sludge Sludge pump 230 V AC 50 Hz Optional PE Green yellow N blue L brown 12 230V IN Mains voltage supply 110 230 V AC 50 Hz PE Green yellow N blu...

Страница 10: ...to the clear water tank The filtration start time T1 T2 and filtration duration A1 A2 can also be separately adjusted Neither aeration nor filtration operations occur in pause mode Application Filtra...

Страница 11: ...2 16 00h Air ON OFF BRmin CLmax Menu1 Change number of MEM NEXT MEM 2 ENTER Set NEXT NEXT NEXT ENTER ENTER ENTER ENTER ENTER Key Infinite loop up until a selection is made with ENTER NEXT NEXT Key Ret...

Страница 12: ...ENTER for Suction ON Menu4 Testmode Next to next test ENTER Backflash ON Menu4 Test Suction P ADr 1 200bar Autostop 5 59 min Stop with ENTER Exit Menu4 Test Backflush P ADr 1 200bar Autostop 5 59 min...

Страница 13: ...Menu9 Change A1 A2 suction Next exit menu ENTER change A1 A2 NEXT ENTER ENTER ENTER Menu6 Change hour Next 10 26 00h ENTER set hour Menu6 Change minute Next 09 27 00h ENTER set minute NEXT NEXT NEXT...

Страница 14: ...parameters are thereby secured as the timer will continue to operate Time Start time Pump cycle 1 Status display Aeration ON OFF Bioreactor MIN Water level BRmin full BRmin empty Number of pump cycle...

Страница 15: ...of membranes MEM 1 3 Start time T1 T1 04 00 hrs 4 Start time T2 T2 16 00 hrs 5 Pump cycles A1 A2 4 9 6 Blower time Air ON Air OFF 5 10 min min 7 Suction overflow SO 0 week 8 Sludge pump SLP t 0 0 Week...

Страница 16: ...a way so that the pump pumps out at least half the bioreactor volume Menu 4 Test menu Test menu for blower suction pump back flushing pump and sludge pump The blower air suction pump suction pump bac...

Страница 17: ...T2 for pumping cycle Note for selection of start time points T1 and T2 The pump starting times T1 and T2 are primarily set according to the times of input water for instance grey water being processe...

Страница 18: ...A 5 The pump cycle can be interrupted by the float switch BR min when the water level for the membrane falls below the minimum allowed level and CL max when the clear water tank is full Menu 10 Blowe...

Страница 19: ...ckets are mounted to the wall next to each other Note Pay attention that there is space to open the housing lid above the housing and a place for cable routings below the housing installation space ea...

Страница 20: ...station Fig Overview of Membrane station 1 Backflushing container 2 Backflushing pump 3 Suction pump 4 Permeate distributor 5 aeration pipe 6 Membrane cartridge 7 Wheel weight 8 aeration distributor n...

Страница 21: ...nstallation Only when at least 1 or 2 membrane cartridges are positioned in place should all screws be firmly tightened on the central pipe The pump unit is screwed on top of the distribution nozzle u...

Страница 22: ...re the start up process Suggestion Before connecting the blower hose to the aeration pipe it should be connected to the connection on top of the back flushing tank in order to pressurize the membrane...

Страница 23: ...nsert cable in the opening underneath Then release the screwdriver terminal closes and remove Note NOTE It must be observed during connection of the electrical wiring that the bottom pump is the sucti...

Страница 24: ...rized in the suction chamber of the pump Initially Only now the test mode of the suction pump can be started as the pumps are not self priming The suction pump must be run until the water flows from t...

Страница 25: ...hen the power supply is to be checked Display after power failure Display with power failure during pump cycle Check pumps via test menu If there is a power failure even in test mode then check for de...

Страница 26: ...n can be obtained from the AQUALOOP Membrane manual Chemical cleaning routine for the AQUALOOP System A cleaning option is available in the control menu of the AQUALOOP Membrane controller A semi auto...

Страница 27: ...ter the completion of the cleaning routine a clear water flushing must be started At least two litres of clear water are filled into the back flushing tank for each membrane 7 With ENTER the clear wat...

Страница 28: ...TENTION Never mix acids and alkali All pipes and connections must be rinsed well with water after being cleaned with acid before cleaning with alkali and the other way around Follow the warning and sa...

Страница 29: ...Lifting height max 6 m Lifting volume max 120 l min Pressure connection 1 hose bush 25mm Cable length 10 m Weight 4 kg 13 Warranty Contact The warranty provisions are included in our sales conditions...

Страница 30: ...29 INTEWA GmbH Version 1 0 Subject to technical changes...

Отзывы: