20
7.1 Installing the membrane station
The membrane station is delivered in separate parts. All connection points are sealed with O-rings or flat
seals.
Installation sequence:
-
Central pipe is connected with lower and top and distributor (do not forget to add weight wheels).
-
Assemble the membrane cartridge with supplied bends and screw them into the top and bottom of
the distributor.
! Mount the membranes on the pipe the right-way-up! See mounting instruction AL-MEM!
Note:
All screws must first be fitted loosely to ensure a tight and water-proof installation. Only when at least
1 or 2 membrane cartridges are positioned in place, should all screws be firmly tightened on the
central pipe.
-
The pump unit is screwed on top of the distribution nozzle until tight (seal via built-in O-Ring in
Pump screw fixing). The pump unit can be installed in any direction because both pumps are
identical. NOTE: It must be observed during connection of the electrical wiring that the bottom pump
is the
suction pump
(clamp terminal: suction pump) and the top pump is the
back flushing pump
(clamp terminal: back flush pump).
-
The back flushing container is screwed onto the top of the pump connection until it is tight.
Fig: Layout of the membrane station
GS 1 : 1 ¼“ O-Ring
GS 2 : 1“ Flat seals
GS 3: 1 ¼“ Flat seal
GS 4: 1“ O-Ring