background image

Section 6, Wiring the Electrical System 

 

International Thermal Research 

6-5 

Thermostat Leads 

·

 

The  power  lead  to  the  thermostat  should  be  fused  (1  Amp) 

and  attached  to  a  power  terminal  (not  provided)  that  is 
connected to the battery. 

·

 

The  return  lead  from  each  thermostat  is  to  be  attached  to 
one  of  the  trailing  thermostat  leads,  color  coded  for  zones, 

from the thermostat and cabin fan 14 pin connector plug on 
the zone control board. 

·

 

The  Oasis

®

  Chinook  has  a  single  space  heating  loop.  The 

"series"  jumper  on  the  zone  board  (below  the  bypass 
jumper, to the left of the largest relay on the board) must be 
put in place. If the "series" jumper is not put in place, then 

the thermostats calling for heat in zones 3, 4, and 5 will not 
activate  the  Heat  Loop  1  pump,  which  is  the  only  space 
heating  pump  in  this  system.  This  will  result  in  cold  air 
blowing from the fans when only zones 3, 4, or 5 are calling 

for heat. 

·

 

When  the  "series"  jumper  is  not  in  place,  the  zone  control 
board uses Heating Loop 1 to supply coolant to Zones 1 and 

2, and uses Heating Loop 2 to supply coolant to Zones 3, 4, 
and  5.  Zones  1  and  2  are  calling  for  heat,  the  zone  control 
board will activate the Heat Loop 1 pump. When Zones 3, 4, 

and  5  are  calling  for  heat,  the  zone  control  board  will 
activate the Heat Loop 2 pump.  

6.5  What NOT to Do 

Never  shut  off  the  Oasis

®

  Chinook  Heating  System  power  via  an 

inline battery or master switch while the system is running.  Never 
disconnect the battery when the Oasis

®

 Chinook Heating System is 

running,  and  never  disconnect  the  battery  while  the  inverter  is 

charging.  Do not wire the Oasis

®

 Chinook Heating System through 

a disconnect that is used as a normal shut-down of the DC system. 

Doing  either  will  severely  damage  the  Oasis

®

  Chinook  Heating 

System  because  it  fails  to  automatically  purge  the  combustion 
chamber.  Such  damage  is  detectable  upon  inspection  and  will  not 
be covered under warranty.  Always shut the system off using the 

normal system controls, after it has completed its purge and cooled 
down the combustion chamber.  

NOTICE 

Содержание OASIS Chinook

Страница 1: ...g System Installation and Operating Manual Diesel and AC Heating System for Recreational Vehicles and Mobile Homes CAN CSA C22 2 No 110 94 R2014 CSA B140 10 06 R2015 CSA B140 0 03 R2018 UL307A Edition...

Страница 2: ...at com All rights reserved No part of this manual may be reproduced or transmitted in any form by any means electronic or mechanical including photocopying and recording information storage retrieval...

Страница 3: ...em Model 2 2 2 3 Your Mounting Location 2 2 2 4 What NOT to Do 2 4 2 5 Oasis Chinook Mounting Procedure 2 4 2 6 Zone Control Board Mounting Procedure 2 5 2 7 Remote Operating Panel Mounting Procedure...

Страница 4: ...System 6 1 6 1 Before You Begin 6 1 6 2 Oasis Chinook 12 VDC 6 2 6 3 Oasis Chinook 120 VAC 6 3 6 4 Wiring The Zone Control Board 6 4 Cabin Fan Leads 6 4 Thermostat Leads 6 5 6 5 What NOT to Do 6 5 Sec...

Страница 5: ...5 Activating the Cabin Fan Heaters through the Thermostats 8 6 8 6 Activating the Potable Hot Water 8 6 8 7 Potable Water Temperature Adjustment 8 7 8 8 Activating the Engine Heat Pre heat 8 8 8 9 Fun...

Страница 6: ...n s Aquastat 5 2 Figure 5 2 Mounting a Low Profile Cabin Fan 5 6 Figure 5 3 Installing a Relay for Add l Fan Amperage 5 6 Figure 6 1 System Wiring 6 2 Figure 7 1 Oasis Chinook Overview 7 3 Figure 7 2...

Страница 7: ...ok Heating System is CSA UL certified only for installation into Recreational Vehicles Manufactured Homes and Mobile housing This section covers critical information you need to know before beginning...

Страница 8: ...rmation for a proper installation A properly installed Oasis Chinook Heating System is essential for several reasons To ensure that you and or your customers receive satisfactory results and enjoy a w...

Страница 9: ...hrough the use of its integral distribution pumps the Oasis Chinook Heating System has the ability to circulate the coolant fluid to all space heating areas It can also provide a supply of potable hot...

Страница 10: ...ble of burning a wide variety of diesel based fuels CSA UL certified for diesel 1 and 2 Exhaust has minimal smoke and smell Fan assisted sealed combustion chamber is designed to use outside combustion...

Страница 11: ...nstallation are Mounting location restrictions for the Oasis Chinook Heating System and exhaust outlet to reduce noise vibration heat loss etc Length routing and sizing of fluid lines air flow tubing...

Страница 12: ...the heating system not supplied This list does not include optional equipment and accessories Standard tools normally available in a well equipped shop Approved fasteners for mounting the heater unit...

Страница 13: ...the heating zones 1 6 Testing and Inspection After all components have been properly installed according to standard practices RVIA standards and the recommendations of this Installation and Operatin...

Страница 14: ...Chinook Heating System Oasis Chinook Heating System weight when full 163 lbs Ventilation requirements Exhaust outlet location and maximum acceptable length including all 90 degree bends Refer to sect...

Страница 15: ...outside case of the Oasis Chinook Heating System The serial number identifies the model type through the first series of letters and numbers 2 3 Your Mounting Location Your mounting location should co...

Страница 16: ...tions The following are the minimum required clearances 12 top clearance 12 front clearance 0 clearance to all other Oasis Chinook Heating System surfaces Allow 1 clearance on the left and right side...

Страница 17: ...o contain any unexpected leak Choose a sturdy surface in a location that won t be unduly affected by vibration and jarring from rough roads Ensure that the exhaust tubing can be properly and safely ro...

Страница 18: ...Procedure Mount the Zone Control Box containing the Zone Control Board vertically close to the Oasis Chinook Allow sufficient room to access the internal fuses as well as to view the display LED s on...

Страница 19: ...ote Operating Panel Mounting Procedure The Remote Operating Panel is mounted inside the Coach in an easy to access location An opening for the remote panel must be cut in the wall or mounting panel Th...

Страница 20: ...Section 2 Mounting the Oasis Chinook Heating System International Thermal Research 2 7 Figure 2 5 Touchscreen Operating Panel Mounting...

Страница 21: ...without coming in contact with air that can infiltrate the living areas See section 3 3 Never place any exhaust parts close to combustible material or through a combustible wall or ceiling without fir...

Страница 22: ...r Installation You may use sweeping bends but each 90 bend is equivalent to two feet of exhaust piping For example if you use two 90 bends you must subtract 2 per bend from the maximum allowed 12 exha...

Страница 23: ...integrity make repairs or replacements if necessary Appropriate exhaust insulation must be used to cover the entire length of any interior exhaust run Solid stainless steel exhaust tubing or approved...

Страница 24: ...ocedure Figure 3 1 Installing the Exhaust System shows a standard setup for the down exhaust To install the exhaust system 1 Leave suitable air spacing to protect combustible materials use an exhaust...

Страница 25: ...air intake adapter Drill a 2 hole through the side wall minimum maximum 2 wall thickness Insert the adapter and use 3 screws to mount it against the side wall Use a 32 gear clamp to attach the air in...

Страница 26: ...Section 3 Installing the Exhaust System 3 6 The Oasis Chinook Heating System Figure 3 1 Installing the Exhaust System Figure 3 2 Exhaust Hole Location Mounting Template...

Страница 27: ...ing System location The Oasis Chinook Heating System is not rated for use in an explosive environment Never share the fuel supply to the Oasis Chinook Heating System with any other fuel burning device...

Страница 28: ...uring normal operation All fuel line connection points and hoses must use suitable clamps and or sealant and must be checked for leaks on the initial installation and also periodically as part of norm...

Страница 29: ...gn material 4 4 Procedure To complete the fuel system installation 1 Install an inline fuel filter The optimal location is on a compartment wall next to the Oasis Chinook inline between the fuel tank...

Страница 30: ...20 000 BTU h It comes with a 3 speed switch to control the speed of the fan For best results the fans should be mounted as close to the floor as possible They have a built in aquastat optional which t...

Страница 31: ...ll not run the fans unless the coolant inside the Oasis Chinook tank is above 120F However during the initial startup the coolant in the lines will be lower than 120F until it has had a chance to mix...

Страница 32: ...heat for the installed heater unit Fan Guards to protect the fan blades from damage recommended for fans installed in storage areas or other accessible areas where something could contact the fan blad...

Страница 33: ...the mounting locations of your fans Locate the fans to evenly heat the specific zone Provision must be made to protect potable water lines from freezing Install fan at floor level or very near floor l...

Страница 34: ...wire these up to the Zone Control Board in Section 6 Wiring The Electrical System 4 The Zone Control Board can control up to 5 zones The cabin fan 1 lead orange can supply up to a maximum of 10 Amps...

Страница 35: ...Section 5 Installing Fan Heaters 5 6 The Oasis Chinook Heating System Figure 5 2 Mounting a Low Profile Cabin Fan Figure 5 3 Installing a Relay for Additional Fan Amperage...

Страница 36: ...l Board Thermostats Cabin Fans To review the wiring for the Oasis Chinook Heating System refer to the wiring diagram shown in Figure 6 1 System Wiring All electrical connections and wiring must comply...

Страница 37: ...wn Cabin Fan 5 Light Blue Harness 2044 50 5 feet Figure 6 1 System Wiring 6 2 Oasis Chinook 12 VDC The following apply to the 12 VDC connections of the Oasis Chinook There is one paired set of 12 VDC...

Страница 38: ...er system is required for safe trouble free operation 6 3 Oasis Chinook 120 VAC The Oasis Chinook Heating System is equipped with two 1500 watt 120 VAC 60 Hz immersion elements The connections for the...

Страница 39: ...l Board The Zone Control Board connects to the thermostats and cabin fans through a 14 pin plug with butt connect leads Cabin Fan leads The positive red lead from each cabin fan is to be attached to o...

Страница 40: ...umper is not in place the zone control board uses Heating Loop 1 to supply coolant to Zones 1 and 2 and uses Heating Loop 2 to supply coolant to Zones 3 4 and 5 Zones 1 and 2 are calling for heat the...

Страница 41: ...ue to a leak in the heat exchanger which could be caused if the fresh water in the system is allowed to freeze For an efficient Oasis Chinook Heating System operation you must Minimize heat loss from...

Страница 42: ...tting must be fitted into the Oasis Chinook coolant return connection All connections must be tightened to a leak free condition using an appropriate thread sealant Hose and or tubing used to connect...

Страница 43: ...Section 7 Plumbing the System International Thermal Research 7 3 Figure 7 1 Oasis Chinook Overview Figure 7 2 Plumbing Oasis Chinook For 5 Zones...

Страница 44: ...han the preceding fan The temperature difference will be larger if the fan has a higher BTU output The Oasis Chinook should be filled and flushed prior to operation to remove any foreign debris Use he...

Страница 45: ...ter should be plumbed so that fluid supply enters the bottom of the heating core and exits from the top This helps keep air from being trapped in the cabin fan core Ensure proper direction of flow Ref...

Страница 46: ...be connected using NPT to PEX crimp fittings The maximum water supply pressure to the heater is 150 PSI 10 bar The Hot water Outlet temperature is regulated by an internal mixing valve factory set at...

Страница 47: ...can be used to make the connection to the engine coolant hose Hot coolant from the engine enters the Oasis Chinook at the Engine Supply The Engine Return returns the coolant back to the engine This m...

Страница 48: ...stem 1 Do not operate the Oasis Chinook Heating System until the proper water anti freeze solution has been added to the Oasis Chinook Heating System and all trapped air has been bled An inadequate mi...

Страница 49: ...til the coolant lines are filled and the overflow bottle fills to the Minimum when cool level 4 When this level is reached turn OFF the filler pump and keep the bypass switch turned ON until the syste...

Страница 50: ...provide a source of heat for all hydronic space heating needs Through the use of its integral distribution pumps the Oasis Chinook Heating System has the ability to circulate the coolant to all space...

Страница 51: ...coolant tank that minimizes heat loss and optimizes heat recovery Domestic water flow switch for quick response to domestic hot water demand Low coolant level switch on the tank Quiet operation Low pr...

Страница 52: ...ostic information 8 2 Operating Instructions for the Oasis Chinook Heating System The Oasis Chinook Heating System must be installed and connections made in accordance with the recommendations in this...

Страница 53: ...ed ON power LED will turn ON to turn the DC electrical power to the main control board ON and is required to be left ON whenever heat is required The Zone Control board Figure 8 4 will be powered when...

Страница 54: ...iesel burner will turn OFF If the Oasis Chinook Heating System coolant should cool down below this temperature range the burner will again commence firing and will continue until either the burner swi...

Страница 55: ...o the Zone Control Board and calling for heat will cause the cabin fan controlled by that thermostat and loop pump to be enabled only if the coolant inside the Oasis Chinook is above 120F The Chinook...

Страница 56: ...of incoming supply water and maintain the temperature to which it is set However in some cases the temperature of the incoming water and the flow rate demand of multiple faucets may limit the ability...

Страница 57: ...ce the Oasis Chinook Heating System is within its set operating temperature range The engine will start to be preheated by the Oasis Chinook Heating System Engine Heat Used for Potable Water or Space...

Страница 58: ...ition AC element switch one ON OFF engine heat switch to control the optional engine pre heat pump and four LED s indicating Burner activation AC element activation heater fault and zone fault Figure...

Страница 59: ...re Burner LED Green When ON indicates the diesel burner has been activated AC Heat LED Green When ON indicates one or both of the 120 VAC immersion elements s are operating Heating Module Fault LED Re...

Страница 60: ...ass button is for authorized service personnel only Reset Button The reset button when pressed resets the control board Power LED Green The power LED green turns ON when the power to the control board...

Страница 61: ...e bypass jumper to the left of the largest relay on the board must be put in place If the series jumper is not put in place then the thermostats calling for heat in zones 3 4 and 5 will not activate t...

Страница 62: ...ble water heat exchanger When the Burner is turned ON the Zone Control Board will turn on the Summer Pump and circulate hot coolant through the internal circuit to provide even heating in the coolant...

Страница 63: ...fuse has been blown 8 12 Potable Water and Space Heating Priority By default the Zone Control Board is shipped with the heating priority set for potable hot water This means that when there is a call...

Страница 64: ...lant hoses and fittings for leaks and integrity Check coolant level in the overflow bottle 3 4 full when hot Fill only when the system is COLD and in small quantities only to prevent overfilling Exhau...

Страница 65: ...any apparent visual signs or operating symptoms The major components such as the air compressor fuel pump fuel nozzle and combustion air fan should be examined for wear and should be serviced or repla...

Страница 66: ...as safe GRAS by the FDA in the Oasis Chinook Heating System Read and follow the anti freeze manufacturer s instructions for the type of anti freeze and mixture recommended for your application Note th...

Страница 67: ...l Panel Burner switch on Remote Operating Panel ON Burner LED lit on Remote Operating Panel Main fuse or circuit breaker blown or tripped AC immersion elements do not activate Primary Electric Element...

Страница 68: ...ernational Thermal Research 8 19 Burner Starts but Zone Faults Power LED on Zone Control Board glowing green Component matched LED pairings all glowing green on the Zone Control Board Fuse blown for o...

Страница 69: ...luable reference if you need warranty repairs in the future Limited Warranty The following warranties are in lieu of all other warranties and conditions ITR makes no other warranties representations o...

Страница 70: ...Product was originally purchased about a warrantable failure and to obtain prior written approval for warranty repair Original serial number on Product or electrical control board has been removed alt...

Страница 71: ...n an authorized service person may be able to visit your coach or yacht to help troubleshoot problems and repair your Product Such service calls are at the Owner s expense Regardless you must obtain w...

Страница 72: ...s given only in good faith as an accommodation to the customer Such information should not be relied upon without an independent verification of its applicability to the customer s particular situatio...

Отзывы: