![International Thermal Research OASIS Chinook Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/international-thermal-research/oasis-chinook/oasis-chinook_installation-and-operating-manual_2080024013.webp)
Section 1, Overview
International Thermal Research
1-7
·
Overflow tank to connect to the Oasis
®
Chinook with clear plastic
1/2" hose; tank must be made of heavy-duty plastic, vented with
a screw-down cap, have an overflow outlet, and sturdy enough
to mount firmly to a vertical surface.
·
Up to five (5) thermostats (DC compatible) to allow temperature
regulation of the heating zones.
1.6 Testing and Inspection
After all components have been properly installed according to
standard practices, RVIA standards, and the recommendations of
this Installation and Operating Manual, the Oasis
®
Chinook Heating
System should be test-operated for inspection purposes.
For your convenience, you can use the pullout Inspection Check
Sheet in this Manual. The Inspection Check Sheet is divided into
progressive sections, allowing each phase of the inspection to be
carried out systematically, and then signed off by authorized
persons.