vi
Section 8, Operating the Oasis
®
Chinook Heating
System.................................................................... 8-1
8.1
Features of your Oasis
®
Chinook Heating
System ...................................................... 8-1
8.2
Operating Instructions for the
Oasis
®
Chinook Heating System ..................... 8-3
8.3
Turning the Power to the
Oasis
®
Chinook Heating System ON ................ 8-4
8.4
Activating the Burner and AC Heat from the
Remote Operating Panel................................ 8-5
8.5
Activating the Cabin Fan Heaters
through the Thermostats............................... 8-6
8.6
Activating the Potable Hot Water .................... 8-6
8.7
Potable Water Temperature Adjustment........... 8-7
8.8
Activating the Engine Heat & Pre-heat ............. 8-8
8.9
Functions of the Remote Operating Panel......... 8-9
8.10
Functions of the Oasis
®
Chinook Control
Panel ....................................................... 8-11
8.11
Functions of the Zone Control Board ............. 8-12
8.12
Potable Water and Space Heating Priority ...... 8-14
8.13
Maintenance ............................................. 8-15
8.14
Protecting the Heating System ..................... 8-17
8.15
General Troubleshooting ............................. 8-18
Warranty Information & Warranty Card