26
If installing a new Geometry Accelerator board, use a quarter-inch nutdriver to remove
the blanking plate from the following slot:
Desktop system: PCI slot 1
Deskside system: PCI slot 5
Retain the screw.
6. Remove the installed board from the system.
7. Install the new Z13, Z25, V25, or Geometry Accelerator board in the slots from which
you removed the previously installed boards.
If installing a new Geometry Accelerator board, install the board in the PCI slot opened in
step 5.
8. Install the screws that were previously removed to secure the Z13, Z25, V25, or
Geometry Accelerator board to the system chassis.
9. If a Geometry Accelerator board is installed, connect the Vertex data bus between it and
the graphics board(s). Refer to the figures in step 4.
NOTE
The connector of the Vertex data bus can be installed in only one orientation.
10. If replacing Z13, Z25, or V25 in a dual-screen deskside configuration, connect the clock
sync cable between the graphics boards. Refer to the figures in step 4.
CAUTION
The clock sync cable installs only one way. Do not force the keyed connector. Ensure pin 1
of both cable connectors engages pin 1 on both board connectors. The black wire connects
to pin 4.
11. Close the system base unit.
12. Go to “Connecting the Video Cables” later in this chapter to connect the monitor cables.
Installing a Dual-Screen Upgrade
A dual-screen upgrade provides components to upgrade a TDZ deskside workstation from a
single-screen configuration to a dual-screen configuration. Verify that you have the following
items.
u
Z13, Z25, or V25 board
u
Vertex data bus for dual-screen configuration (used only if optional Geometry
Accelerator is installed)
u
Clock sync cable
u
Antistatic wrist strap
NOTE
You cannot install a dual-screen upgrade in a desktop system.
Содержание RealiZm Graphics V25
Страница 1: ...RealiZm Graphics Hardware User s Guide February 1997 DHA017120...
Страница 4: ......
Страница 8: ...viii...
Страница 84: ......