background image

ii

Warning

 

Read all caution and safety 

 

statements in this document 

 

before performing any of the 

instructions. Also see the 

Intel

®

 

Server Board and Server Chassis 

Safety Information

 document at:

http://www.intel.com/support/

motherboards/server/sb/cs-010770

.htm

 

for complete safety information.

Warning

           Installation and service

           of this product to be

           performed only by

qualified service personnel

to avoid risk of injury from

electrical shock or energy

hazard.

Caution

 

Observe normal ESD

            [Electrostatic Discharge]

            procedures during system

integration to avoid possible

damage to server board and/or

other components.

Tools Required

        Anti-static

wrist strap

     Phillips*

screwdriver

Intel

®

 is a registered trademark of Intel Corporation or its subsidiaries in the United States and other countries. *Other names and brands may be claimed as 

the property of others. Copyright © 2012, Intel Corporation. All rights reserved.

Thermal Operation and Configuration Requirements

To keep the system operating within supported maximum thermal limits, the system must meet the following operating and 
configuration guidelines:

• Ambient inlet temperature cannot exceed 35º C and should not remain at this maximum level for long periods of time.

    Doing so may affect long term reliability of the system.

• The CPU-1 processor and CPU heatsink must be installed first. The CPU-2, CPU-3, and CPU-4 heatsink must

    be installed at all times, with or without a processor installed.

• 

Memory Slot population requirements:

NOTE

: Specified memory slots either can be populated with a DIMM or supplied DIMM Blank. Memory population

           rules apply when installing DIMMs.
      

▪ 

DIMM Population Rules on CPU-1

 

         Install DIMMs in order; Channels A, B, C, and D. Start with first DIMM slot (blue) on each channel, then slot 2, then
         slot 3. Remove only DIMM blanks when populating the slot with a DIMM.

     ▪ 

DIMM Population Rules on CPU-2 

        

Install DIMMs in order; Channels E, F, G, and H. Start with first DIMM slot (blue) on each channel, then slot 2, then

         slot 3. Remove only DIMM blanks when populating the slot with a DIMM.

     ▪ 

DIMM Population Rules on CPU-3

        Install DIMMs in order; Channels J, K, L, and M. Start with first DIMM slot (blue) on each channel, then slot 2, then
        slot 3. Remove only DIMM blanks when populating the slot with a DIMM.

     ▪ 

DIMM Population Rules on CPU-4

          Install DIMMs in order; Channels N, P, R, and T. Start with first

 

DIMM slot (blue) on each channel, then slot 2, then

         slot 3. Remove only DIMM blanks when populating the slot with a DIMM.

• All hard drive bays must be populated. Hard drive carriers either can be populated with a hard drive or supplied

   drive blank.

• The air duct must be installed at all times.

• In single power supply configurations, the second power supply bay must have the supplied filler blank installed

    at all times.

• The system top-cover must be installed at all times. The only exception to this requirement is to hot replace

    a failed system fan, in which case the top cover can be removed for no more than three minutes at a time.

Содержание R2000LH2

Страница 1: ... If you are not familiar with ESD Electrostatic Discharge procedures used during system integration see the complete ESD procedures described in your Service Guide This guide and other supporting documents are located on the web at http www intel com support G54804 003 Intel Server System R2000LH2 LT2 Product Family Quick Installation User s Guide 3 5 hard drive bay system as shown ...

Страница 2: ... This page is intentionally left blank ...

Страница 3: ...k s 3 Install Processor s 3 Install Processor Heatsink s 4 Install Memory Modules 4 Install Hard Drives 5 Install Optical Drive 8 Install Intel I O Expansion Module optional 8 Install Intel RAID C600 Upgrade Key optional 8 Install Air Duct 9 Install Add in Card s 9 Install Add in Card Riser Assembly 10 Install Intel RAID Smart Battery optional 10 Install Top Cover 10 Install Power Supply Module 10...

Страница 4: ...stalled at all times with or without a processor installed Memory Slot population requirements NOTE Specified memory slots either can be populated with a DIMM or supplied DIMM Blank Memory population rules apply when installing DIMMs DIMM Population Rules on CPU 1 Install DIMMs in order Channels A B C and D Start with first DIMM slot blue on each channel then slot 2 then slot 3 Remove only DIMM bla...

Страница 5: ... Upgrade Key installed to be functional O p t i c a l D e v i c e A s s e m b l y Hard Drive Bays System Fans CPU2 CPU 3 Add in Card Riser Assembly 1 1 Redundant Power Supply Modules Server Board Air Duct Optical Drive Bay Front Control Panel CPU1 CPU4 System Features and Components A i r d u c t 3 5 Hard Drive Bay system as shown ...

Страница 6: ...cedures before reaching inside to make server board connections or install components CAUTION Unplug all AC power cords and remove all power supply modules before lifting tilt bay Lift up the tilt bay A Bend and slide out the air duct B Remove the air duct from the chassis C O p t i c a l D e v i c e A s s e m b l y A B B C 5 Remove Air Duct O p t i c a l D e v i c e A s s e m b l y B B A 3 Remove...

Страница 7: ...n the underside of it Use caution so that you do not damage the thermal interface material Use gloves to avoid sharp edges Using a 2 Phillips screwdriver loosen the four screws located on the heatsink corners in a diagonal manner using the following procedure Using a 2 Phillips screwdriver start with screw 1 and loosen it by giving it two rotations and stop IMPORTANT Do not fully loosen Proceed to...

Страница 8: ...ocket CPU 4 Socket CPU 3 Socket DIMM_E1 DIMM_E2 DIMM_E3 DIMM_F1 DIMM_F2 DIMM_F3 DIMM_L1 DIMM_L2 DIMM_L3 DIMM_M1 DIMM_M2 DIMM_M3 DIMM_J1 DIMM_J2 DIMM_J3 DIMM_K1 DIMM_K2 DIMM_K3 DIMM_R1 DIMM_R2 DIMM_R3 DIMM_T1 DIMM_T2 DIMM_T3 DIMM_N1 DIMM_N2 DIMM_N3 DIMM_P1 DIMM_P2 DIMM_P3 DIMM_G1 DIMM_G2 DIMM_G3 DIMM_H1 DIMM_H2 DIMM_H3 DIMM_C1 DIMM_C2 DIMM_C3 DIMM_D1 DIMM_D2 DIMM_D3 DIMM_A1 DIMM_A2 DIMM_A3 DIMM_B1 ...

Страница 9: ...only Hard Drive Numbering Diagram Drive 0 Primary 8 x 2 5 hard drive bay as shown A B Press the green latch to unlock Pull out the black lever and slide the carrier out D C Remove the four screws securing the plastic drive blank from the 2 5 HDD carrier Disengage the plastic drive blank from the HDD carrier Remove the plastic drive blank from the 2 5 HDD carrier C D Install the hard disk drive usi...

Страница 10: ...k drive using the same four screws as shown Make sure the connector end of the drive matches the backplane connector With the lever open insert the hard disk drive assembly into the chassis Push in the lever to lock it into place d1 Bottom View T O P B R E A K O F F T A B B E F O R E M O U T IN G 2 5 H A R D D R IV E d2 CAUTION If you don t install all drives empty drive bays must be occupied by c...

Страница 11: ...e Drive with the four screws C Slide the Solid State Drive carrier into the chassis D Secure the Solid State Drive carrier with the two screws E Connect the cables F Remove the six screws securing the front end module from the chassis A Slide the front end of the module forward a little B Push the front end module into place A Align the rack handle with the two holes on the side of the server syst...

Страница 12: ...server board connector NOTE If included remember to install the EMI shield B I O Module A C Install the module to the provided bracket Secure the module to the bracket with the three screws Install the provided connector converter Fix the I O Module to the Bracket before installing it at the left edge of the Board A B C 11 Install Optical Drive A B IMPORTANT NOTE If you do not install a device at ...

Страница 13: ...ON Observe normal ESD precautions when installing add in cards Remove the filler panel from the add in card slot and install the provided proper bracket as shown Insert add in card until it sits in the riser connector Secure add in card with screw provided with bracket as shown NOTE Make sure that all empty add in card slots have filler panels installed For Half length PCI Add in Card s For Full l...

Страница 14: ...e mounting holes A B O p t i c a l D e v i c e A s s e m b l y A C B 16 Install Add in Card Riser Assembly NOTE Please make sure the release lever is in UP position before installing the add in card riser assembly A Position the riser card connector edge over the server board riser socket and align the riser bracket to the plastic guides on the chassis Press down the release lever to install the r...

Страница 15: ...t the appropriate drivers to install On other operating systems browse the CD folders to locate and install the driver files Download the latest version of the Intel System Management Software from http www intel com content www us en server management intel server management html and use the instructions provided at that link to install the software NOTE The FRUSDR utility must be run for full pl...

Страница 16: ...t Panel Header J106 Front Panel Video Main Power 2 Main Power 1 IPMB PDB Signal LCP HSBP I2 C Fan Board Power 3 2 Default Password Clear 3 2 Default Password Clear 3 2 Default Password Clear J74 BIOS Recovery J75 BIOS Default 3 2 Default J73 Password Clear Password Clear J81 ME Force Update 3 2 DSR Default DCD J33 Serial A Jumper 3 2 Default Enabled J37 BMC Force Update DIMM_E1 DIMM_E2 DIMM_E3 DIM...

Страница 17: ...essories and spares can be found at http www intel com p en_US support O p t i c a l D e v i c e A s s e m b l y 11 10 9 8 AirFlow System Fan Connection System Fan Board FAN 7 FAN 6 FAN 5 FAN 4 FAN 3 FAN 2 FAN 1 FAN 9 FAN 8 FAN 11 FAN 10 ...

Страница 18: ...Front Panel Video Front Panel USB GPGPU GPGPU Intel Integrated RAID Module BBU RMFBU2 NOTES To activate the port SCU1 4 7 on the server board a proper Intel RAID C600 Upgrade Key must be installed For instructions see Intel RAID C600 Upgrade Key Installation Guide A second SSD is supported when the optical drive is NOT in use System Cabling Diagram For System with 4 x 3 5 Hard Drive Bay ...

Страница 19: ...st be installed For instructions see Intel RAID C600 Upgrade Key Installation Guide A second SSD is supported when the optical drive is NOT in use CPU4 Socket CPU3 Socket CPU1 Socket CPU2 Socket System Fan Board 8 x 2 5 HSBP Power Supply SSD SSD Optical Drive I 2 C HSBP_I2C Front Panel Front Panel Video Front Panel USB Intel Integrated RAID Module BBU RMFBU2 GPGPU GPGPU ...

Страница 20: ...G54804 003 ...

Отзывы: