Intel
®
Server System R1000WF Product Family System Integration and Service Guide
5
1.
Install the Server Board
Figure 5. Server Board Installation
Note:
Follow ESD precautions outlined at the beginning of this manual.
a)
Carefully move aside any cables that may be taped to the chassis base to clear the area for server
board placement.
b)
Remove the server board from its anti-static bag.
c)
Holding the server board by its edges, carefully lower the server board into the chassis so that the
rear I/O connectors of the server board align with and are fully seated into the matching holes on
the chassis back panel and each server board mounting hole is aligned with a threaded chassis
standoff.
d)
The server board is accurately placed when the two screw holes nearest the front edge of the server
board (See Letter “A”) sit securely onto the shouldered chassis standoffs.
e)
Using 8 in-lb. torque, fasten down the server board with eight (8) screws in the positions shown in
Figure 5.
Содержание R1000WF Series
Страница 2: ...Intel Server System R1000WF Product Family System Integration and Service Guide Blank Page ...
Страница 16: ......