![Intel Omni-Path Director Class Switch Series Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/intel/omni-path-director-class-switch-series/omni-path-director-class-switch-series_installation-manual_2073475040.webp)
Figure 15.
Clamp over Rail Post
4. Reattach the rail post, which locks the clamp into place.
Figure 16.
Reattach the Rail Post
Installing the Switch Fascia
The Edge switch fascia guards against ESD as well as accidental contact with the fans
and power supplies.
2.3.4
Intel
®
Omni-Path Fabric—Installation
Intel
®
Omni-Path Fabric Switches Hardware
Installation Guide
June 2019
40
Doc. No.: H76456, Rev.: 10.0