99
|
P a g e
for your paver in the Appendix 4: Emulsion tank configuration
(page 140) to determine the volume of fluid in the tank.
Note:
When measuring fluid level with the dipstick, place
the dipstick into its bore, but DO NOT thread the dipstick into the
bore.
3.
In the Totals screen of the display screen unit, zero the job totals
by holding down the circular arrow key [2R] (see Figure 48)
for at
least 5 seconds.
Figure 48:
Zeroing the job totals
4.
Begin spraying in the Spay Auto mode. Continue until the tank
gets low. Be sure to not run the tank too low, or a dipstick
measurement will not be possible. Stop and start spraying as
necessary during this process to check the tank level.
5.
With the paver parked on a level surface, use the emulsion tank
dipstick to measure the volume of fluid in the tank. Use the tables
in Appendix 4: Emulsion tank configuration to determine the
amount of emulsion in the tank from the dipstick value.
Содержание Spray Paver
Страница 10: ...15 P a g e Figure 1 Safety decal location may vary depending upon model x2 x2 X2...
Страница 22: ...41 P a g e Figure 21 Solenoid valve manifold in its enclosure...
Страница 58: ...Integral dx 121 N 1st Street Montevideo MN 56265 USA T 320 269 3227 www integraldx com sales integraldx com...