14
Installation instructions & user guide
T210047 v1.00 March 2022 - InstaTap Commercial
SECTION 6 Installing the under counter appliances
6.5 I2CBC1020 General in cupboard arrangement
• Install the under counter boiler and chiller as
close to the tap as possible, use the illustration
below as a guide, and follow the steps through
this section of the manual.
BC office
Under counter boiler (UCB)
1
2
UCB Mains electricity supply
5
UCB control cable
3
UCB mains water connection
4
UCB Boiling water tube
Water filter
12
Water block
14
11
Interconnect cable
UCB overflow & vent tube
6
Under counter chiller (UCC)
7
UCC Mains electricity supply
8
UCC mains water connection
9
10
Filter head
13
Mains water supply
17
16
Font waste pipe
15
Waste to drain
18
Isolation valve (install rail inc.
non return valve )
• Install the under counter boiler and chiller as
close to the tap as possible, use the illustration
below as a guide, and follow the steps through
this section of the manual.
2
5
15
1
3
6
17
16
14
12
13
11
9
7
10
8
4
18
UCC Chilled water 3/8”pipe,
connected to silicone tube