SECTION 6 Installing the under counter appliances
!
• A clearance envelope both
sides and above each under
counter appliance must be
provided to allow service access
and ventilation for the safe and
effective use of the under counter
boiler (UCB) and under counter
chiller (UCC).
Use instructions supplied
with individual kit parts.
!
!
Use of tools can be hazardous, assess the risks before you start.
6.1 Positioning and ventilation - in cupboard installation
!
65mm
clearance either side
• Adequate ventilation must be
provided to allow cold air to be
drawn into the bottom of the
cupboard, and hot air expelled
from the top of the cupboard.
• The inlet and outlet vents
supplied with chilled water
systems must be installed to
keep cupboard temperatures
below 30
o
C.
• Door buffers must be fitted to
provide sufficient air flow.
• Cupboard temperatures should
not exceed 30
o
C.
170mm