background image

9

Installation instructions & user guide

 

T210042 v1.00 March 2022 - InstaTap Commercial

SECTION 4 Technical data

Specification

Unit

10 litre UCB

20 litre UCB

Capacity 

L

10

20

Dimensions (W x D x H)

mm

230 x 415 x 520

390 x 475 x 568

Supply voltage

V

220-240 V (50-60Hz) 220-240 V (50-60Hz)

Electrical supply 

A

13 (1 phase)

13 (1 phase)

Power rating

kW

3.0

3.0

Fuse rating 

A

13

13

Mains water pressure

bar

2 - 5

2 - 5

Fill type 

Automatic

Automatic

Max rapid draw-off

L

10

20

Output per hour

L

30

30

Water temperature*

0

C

default 96

default 96

Weight (empty)

kg

10.5

15.3

Weight (full)

kg

22.5

37.0

Heat up time from cold

mins

24

43

Mains water connection 

3/4” BSP

(rail 15mm)

3/4” BSP

(rail 15mm)

Under counter boilers

Specification

Unit

40 litre UCB

50 litre UCB

Capacity 

L

40

50

Dimensions (W x D x H)

mm

560 x 510 x 600

560 x 510 x 600

Supply voltage

V AC

220-240 V (50-60Hz) 220-240 V (50-60Hz)

Electrical supply

A

13 (1 phase)

20A

30A

1 phase

1 phase

Power rating

kW

3.0

4.5

6.75

Fuse rating

A

13

20

30

Mains water pressure

bar

2 - 5

2 - 4

Fill type 

Automatic

Automatic

Max rapid draw-off

L

40

50

Output per hour

L

30

42

63

Water temperature*

0

C

(default 96)

(default 96)

Weight (empty)

kg

24

26

Weight (full)

kg

68

70

Heat up time from cold

mins

88

64

42

Mains water connection 

3/4” BSP

(rail 15mm)

3/4” BSP

(rail 15mm)

*Adjustable

*Adjustable

Содержание InstaTap I2CB10

Страница 1: ...ons user guide T210042 v1 00 March 2022 InstaTap Commercial Instanta InstaTap Installation and user instructions Commercial Under Counter Push Button Dispensers I2CB10 I2CB50 all models I2CBC1020 all...

Страница 2: ...arrangement 13 6 5 I2CBC1020 General in cupboard arrangement 14 6 6 I2CB20 I2CB50 General arrangement 15 6 7 I2CC20 General in cupboard arrangement 16 6 8 Push fit best practice 17 6 9 Connect the wat...

Страница 3: ...1 Replace flush and reset the filter 34 9 1 1 Replace the FL500 filter 34 9 1 2 Flush the filter 35 9 1 3 UCB filter monitor settings 36 9 1 4 Adjust the UCB boiling water temperature 36 9 1 6 Set th...

Страница 4: ...8 years or persons including children under 8 years with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruction con...

Страница 5: ...lified tradesperson The power cable and power outlet must be in a safe visible position for connection Venting Sometimes steam and or boiling water droplets may discharge through the vent overflow out...

Страница 6: ...ove the cover of the under counter boiler and under counter chiller without first isolating them from the power supply Connect only to a potable wholesome cat1 mains water supply Never locate the syst...

Страница 7: ...s with all refrigeration systems irreparable damage can be caused by laying the chiller on its side or even transporting upside down If the under counter chiller has been transported incorrectly it sh...

Страница 8: ...install rail in the installation kit 4 1 Technical data tables SECTION 4 Technical data Under counter chiller Specification Unit Under counter chiller Capacity L N A Dimensions W x D x H mm 180 x 340...

Страница 9: ...5 3 Weight full kg 22 5 37 0 Heat up time from cold mins 24 43 Mains water connection 3 4 BSP rail 15mm 3 4 BSP rail 15mm Under counter boilers Specification Unit 40 litre UCB 50 litre UCB Capacity L...

Страница 10: ...ss connector 1 1 1 Install rail water block 3 2 2 1m 3 8 JG pipe 1 4 5kW 6 75kW link wire I2CB50 models only 1 UCB UCC interconnect cable Under counter chiller ventilation kit 1 1 Air inlet grille ret...

Страница 11: ...ns supplied with individual kit parts Use of tools can be hazardous assess the risks before you start 6 1 Positioning and ventilation in cupboard installation 65mm clearance either side Adequate venti...

Страница 12: ...h under counter appliance must be provided to allow service access and ventilation for the safe and effective use of the UCB Use instructions supplied with individual kit parts Use of tools can be haz...

Страница 13: ...ection of the manual 12 11 2 5 10 13 3 Mains water supply 1 2 Water block 3 4 UCB Mains electricity supply 5 Font waste pipe 6 Waste to drain 7 UCB Control cable 8 UCB mains water connection 9 Water f...

Страница 14: ...rol cable 3 UCB mains water connection 4 UCB Boiling water tube Water filter 12 Water block 14 11 Interconnect cable UCB overflow vent tube 6 Under counter chiller UCC 7 UCC Mains electricity supply 8...

Страница 15: ...e tap as possible use the illustration below as a guide and follow the steps through this section of the manual Mains water supply 1 2 Water block 3 4 UCB Mains electricity supply 5 Font waste pipe 6...

Страница 16: ...tap as possible use the illustration below as a guide and follow the steps through this section of the manual C Comm Under counter chiller UCC 1 2 UCC Mains electricity supply 5 UCC control cable 3 U...

Страница 17: ...ser guide T210042 v1 00 March 2022 InstaTap Commercial 2 Pull pipe out 1 Press collet down Insert Remove 2 Push pipe to end stop 1 Cut pipe clean square 6 8 Push fit best practice SECTION 6 Installing...

Страница 18: ...onsible for any appliance malfunction if the water pressure is not within the range stated If in doubt consult your water supply company Connect to a wholesome cat 1 cold drinking water supply using 1...

Страница 19: ...22 InstaTap Commercial SECTION 6 Installing the under counter appliances 15mm mains water connection Isolation valve Water block 2x 3 4 3 8 adaptor 3 8 flexible pipe Appliance water connections Instal...

Страница 20: ...nnected via the 3 4 3 8 push fit brass fitting supplied Ensure that the direction of flow through the Water Block is correct and that the filter screen see Fig 2 is inserted correctly with the convex...

Страница 21: ...le CONTROL CABLE CHILLED OUT FLOW CONTROL MAINS WATER MAINS ELECTRICITY P U S H L O C K HOT WATER OUT VENT FONT CONTROL UCB White tube Red tube Cable I2CB10 Boiling models top view I2CBC1020 Boiling c...

Страница 22: ...tube Cable I2CB20 I2CB50 single font models top view Mains water in 3 8 pipe Overflow I2CB20 I2CB50 dual font models top view HOT WATER OUT FONT CONTROL S HOT WATER OUT VENT 3 1 2 3 1 2 FONT CONTROL S...

Страница 23: ...of the appliance to drain with brass compression fittings The overflow drain pipe must have 20mm air gap a continuous fall and should not be longer than 300mm if a longer run is required use 22mm pipe...

Страница 24: ...uitable ELCB The mains cable is supplied ready fitted to the appliance Mains cable size 2 5mm Electrical installation should conform to current IEEE wiring regulations Mains cable wiring I2CB20 I2CB40...

Страница 25: ...earth pin of the mains plug Insulation resistance meter or DMM At installation the earth continuity of both the UCB UCC must be checked Use an insulation tester appliance tester DMM or continuity test...

Страница 26: ...O C is displayed I2CB40 I2CB50 models After approximately 4 minutes the CHECK WATER icon flashes and the appliance stops filling Note This is an electronic fault diagnosis check which only happens on...

Страница 27: ...he Water Block and water connection point are not clogged with debris To clear the warning switch off the UCB mains electricity supply and then switch back on When the water level reaches the boiler s...

Страница 28: ...Switch on the mains electricity supply Using the chilled water button on the tap control panel see page 32 dispense 3 litres of water to prime and flush the UCC system Wait 30 minutes the fan and com...

Страница 29: ...ense Boiling manual dispense The exclamation mark on tap flashes when in fault mode at the same time warning triangle flashes on the UCB display screen Boiling Boiling chilled WARNING illuminates when...

Страница 30: ...nd does not need to be disabled when dispensing chilled water Safety lock is illuminated When the safety lock is enabled Exclamation mark is extinguished To disable the safety lock Press safety lock A...

Страница 31: ...anually dispense boiling water place cup on drip tray Press the safety lock 8 3 To dispense boiling water from the UCB NOT READY o C HEATING NOT READY o C HEATING 70 o C SOFT MEDIUM HARD CHANGE FILTER...

Страница 32: ...spense 8 5 Adjust the chilled water flow rate from the UCC The chilled water flow rate have been factory set however on site adjustment may be necessary The water flow rate adjustment knob is on the t...

Страница 33: ...nder counter boiler UCB using ON OFF button Switch OFF mains power supply and wait 10 seconds For I2CB10 I2CB20 I2BC1020 models Switch back ON and at the same time press hold the bottom dispense butto...

Страница 34: ...touch the connector Moisten the new filter connector with clean tap water Insert the new filter see above Flush the filter see page 35 Turn ON the power supply to the UCB and UCC appliances Reset the...

Страница 35: ...rail Flush the new filter with the volume of water stated in the instructions supplied with the filter usually a minimum of 10 litres Turn ON the water supply to the under counter appliances with the...

Страница 36: ...ocal water authority or call Technical Support on 0345 6 005 005 NOT READY o C HEATING 70 o C SOFT MEDIUM HARD CHANGE FILTER Pr NOT READY o C 96 CHECK WATER CHANGE FILTER NOT READY OF READY MED C R Af...

Страница 37: ...for approximately 6 seconds until display goes blank Press ON OFF button to turn the UCB5 back on again The filter monitor on the under counter boiler can be changed from the default MEDIUM setting to...

Страница 38: ...o excessive lime scale in tank Faulty Element Thermistor disconnected wires cut or faulty Boil dry safety switch tripped or faulty De scale tank and level sensors Isolate machine and wait 10mins then...

Страница 39: ...correct installation The manufacturer disclaims any liability for incidental or consequential damages For more information please refer to the online Instanta Warranty Policy Warranty Waste electrical...

Страница 40: ...stallation instructions user guide T210047 v1 00 March 2022 InstaTap Commercial www zipwaterco uk www instanta com Zip Water UK Instanta Trafalgar House Rash s Green Dereham Norfolk NR19 1JG 0345 6 00...

Отзывы: