14
Precedent Units Step 4 - Door Switch (Option)
Door Switch Harness Installation
1. Inside the control box:
•
Connect the 10-pin REB harness connector to RJ5 on the REB
module.
•
Locate the 3-pin Door Switch connector (DS-01, DSP-01,
CHDS-01). Unplug the connectors and reconnect the REB 3-pin
harness door switch connectors (DT04-3P, DT06-3S) between the
two open connectors.
NOTE: Backup battery must be connected to connector RJ6.
Continue to “Configuring Door Switch” on page 18 to complete the
installation.
Содержание Thermo King TracKing
Страница 2: ......
Страница 4: ...2 TracKing Cellular Release History Released 07 15...
Страница 13: ...11 Precedent Units Step 2 Antenna and Battery Installation...
Страница 15: ...13 Precedent Units Step 3 REB Installation...
Страница 17: ...15 Precedent Units Step 4 Door Switch Option...
Страница 19: ...17 Precedent Units Step 5 Fuel Level Option...
Страница 23: ...21 SB Units Step 1 Datalogger Configuration Procedures Text Header...
Страница 27: ...25 SB Units Step 3 REB and Battery Installation...
Страница 29: ...27 SB Units Step 3a REB and Battery Installation SR2 to SR3...
Страница 31: ...29 SB Units Step 3b Units with SR2 or SR3 w Razor...
Страница 33: ...31 SB Units Step 3c For Units with ThermoGuard non SR2...
Страница 35: ...33 Super II Units Step 1 Datalogger Configuration Procedures Text Header...
Страница 37: ...35 Super II Units Step 2 Antenna Installation...
Страница 39: ...37 Super II Units Step 3 TracKing Installation...
Страница 44: ...42 BLANK PAGE...
Страница 46: ......