background image

Specification #8810502

Original 5/14/98

ABS<Comtrak

 1700-1702

Installation & Start-up Procedure

1

                                         Revision, 1/5/99

General Operation:

The ABSComtrak

1700 (model 1700) system consists of a Personal Tracking Unit (PTU) and battery

charge system. During normal operation the PTU is to be connected to the battery charger for a minimum of
seven hours each day. It may than be run for a minimum of seventeen hours before a recharge is required.
During this period the client is free to move within the range, from the shoulder pack,  that the wireless cuff
allows (+/- 20 ft. outdoors and +/- 30 ft. indoors). When moving from one location to the other (i.e. from
home to work) the client (with PTU) must remain /- 20 ft. of the shoulder pack to avoid a proximity
violation. When in a home or other building the client must remain /- 30 ft. to avoid a proximity
violation. For optimum performance the unit should be in an upright position at all times.  When the cuff
bracelet is cut/ removed by the client a cuff violation will be communicated to the customer.

Charger Installation Procedure:

In addition to the Personal Tracking Unit (PTU) each client will be provided with a battery charger, surge
suppressor and cable.  When set up properly, these three components will allow connection to the client’s
home phone line while charging  (Reference Figure 1).

1.0 

 

Assure the surge suppressor telephone plug is connected to charger

1.1 

 

Assure ground (green wire) is securely attached to the ground lug on the charger.

1.2 

 

Connect the telephone cable between the surge suppressor jack and telephone jack in the
home/office.Connect the battery charger to grounded AC power outlet (110 V, 10 amp minimum).

Note: The charger is now ready for charging the batteries in a ABSComtrack

1700.

Содержание Comtrak 1700

Страница 1: ...building the client must remain within 30 ft to avoid a proximity violation For optimum performance the unit should be in an upright position at all times When the cuff bracelet is cut removed by the...

Страница 2: ...ted to the charger 3 The PTU should be left connected to the charger for a minimum three hours a full 7 hours after both Full Chg Lamps are lit to allow for top off of both battery pack A and B If bot...

Страница 3: ...6 5 7 9 0 3 7 0 8 9 5 4 7 5 9 10 0 5 8 0 10 10 5 6 8 5 11 11 0 Table 1 Assemble Transmitter and Battery Align the battery assembly key appropriately with the transmitter assembly slot and lightly eng...

Страница 4: ...ling cabinets walls or refrigerators can result in false proximity violations Wireless Cuff Training Activation Model 1700 1705 Plug in Customer Cuff Tester 1021835 To do this unzip the unit and find...

Страница 5: ...t on the transmitter The buzzer on the Cuff Tester will beep repeatedly if the cuff is properly trained If it doesn t repeat the process over again this time training it longer than five seconds Note...

Страница 6: ...re seat Sections WILL NOT MATE if the alignment pin is not seated in the alignment pin groove 3 Using a 1 phillips screwdriver install the four screws 4 Install the cuff strap Make sure the metal tab...

Страница 7: ...e changes You will be advised of your right to file a complaint with the FCC 4 If the telephone company requests information on what equipment is connected to their lines inform them of a The telephon...

Отзывы: