28
SB Units Step 3b - Units with SR2 or SR3 (w/Razor)
These procedures are for SB-30 series units
with SR2/SR3 Controller using Razor modules.
TracKing Module Installation
1. Open the control box door and install the TracKing mounting plate onto
the inside of the door.
2. Connect the two antenna cables to the TracKing module.
•
Torque to 1.4 N•m (12 in-lbs.)
3. From TracKing harness connect:
•
Two harness connectors to TracKing module.
•
8-pin connector into J12 CAN1 position on controller.
If there is a connector in J12, move it to J13 CAN2.
•
OPTION: If all CAN ports are being used, a CAN extension
harness (41-8187 sold separately) maybe required.
•
4-pin connector into J9 RS232-1 position on controller.
If there is a connector in J9, move it to J10 RS232-1.
NOTE: Plug must be in J9 for Remote Power On/Off to function. If
remote controller is used, the ServiceWatch connector should be left
unplugged.
•
Attach the ground (GND) wire to the control box ground stud.
•
Connect the 3-pin connector (RXB, TXB, DPD) to the mating
HMI/CargoWatch connector if available.
If it is not available, cut off the 3-pin connector and spice wires into
the HMI connector:
4. Secure excess wires inside control box with bandwraps.
NOTE: The TracKing harness is protected by the 3 amp fuse in position
F8 on the relay board.
Power Cycle and Setup Procedures
1. Reconnect the negative battery cable:
•
Turn on the unit
•
Disconnect and reconnect the 7-pin connector - this will perform a
power cycle of the GPRS module.
2. To enable Remote Power On/Off:
a. HMI must be version 6560 or higher or 6517 in SPECTRUM
Multi-Temp.
b. In Guarded Access, Programmable Features, set Remote Device to
“Enabled”.
c. In Guarded Access, Unit Configuration menu, set 3rd Party Device
Control to “COM1”.
3. Attach the supplied nameplate switch warning label to the front door
below the door latch.
4. Allow unit to run and report to website to synchronize settings.
TracKing Verification Procedures
See “TracKing Verification Procedures” on page 38.
HMI Harness
Pin Number
TracKing Harness
TXD3
30
RXB
RXD3
18
TXB
DPD3
7
DPD
Содержание Thermo King TracKing
Страница 2: ......
Страница 4: ...2 TracKing Cellular Release History Released 07 15...
Страница 13: ...11 Precedent Units Step 2 Antenna and Battery Installation...
Страница 15: ...13 Precedent Units Step 3 REB Installation...
Страница 17: ...15 Precedent Units Step 4 Door Switch Option...
Страница 19: ...17 Precedent Units Step 5 Fuel Level Option...
Страница 23: ...21 SB Units Step 1 Datalogger Configuration Procedures Text Header...
Страница 27: ...25 SB Units Step 3 REB and Battery Installation...
Страница 29: ...27 SB Units Step 3a REB and Battery Installation SR2 to SR3...
Страница 31: ...29 SB Units Step 3b Units with SR2 or SR3 w Razor...
Страница 33: ...31 SB Units Step 3c For Units with ThermoGuard non SR2...
Страница 35: ...33 Super II Units Step 1 Datalogger Configuration Procedures Text Header...
Страница 37: ...35 Super II Units Step 2 Antenna Installation...
Страница 39: ...37 Super II Units Step 3 TracKing Installation...
Страница 44: ...42 BLANK PAGE...
Страница 46: ......