Commissioning
INGENIA | 2020-10-01 00:04:38
87
•
•
•
•
•
1.
2.
3.
4.
•
•
•
•
Initial Commissioning
Once the Everest has been installed as described in
, wired according to the
, the initial commissioning can be performed following the Quick Start guide:
Wire the drive
Switch on the power supply
Connect PC and servo drive
Change drive firmware to EtherCAT (optional)
Configure parameters and tuning
12.2.
Decommissioning
Before decommissioning, ensure the power supply is off (wait a minimum of 5 s for capacitors to discharge), and the
drive is cool.
First, disconnect all the cables and connectors.
Then, removing the Everest from the plate or heatsink carefully following this sequence:
Remove the 4x M2.5 screws.
Separate the Everest from the heatsink by prying, torquing or peeling. Make sure the forces are applied to
the Everest enclosure and not to the PCB or connectors.
The thermal tape will be destroyed upon separation. The surfaces should be re-cleaned according to the
recommendations mentioned above. Do not try to reuse the thermal tape.
Heating the substrates can reduce the adhesion level and make removal easier
If you need disposing of the Everest, please:
Be sure to comply with local disposal regulations.
Separate the housing part made of aluminum.
Dispose of the parts following the applicable legal regulations regarding electronic waste.
Dispose of the packaging material following the applicable legal regulations.
Содержание 2147502492
Страница 31: ...Everest XCR Product manual Connectors Guide INGENIA 2020 10 01 00 04 38 31 Image TE B 155 9001...
Страница 72: ...Everest XCR Product manual Wiring and Connections INGENIA 2020 10 01 00 04 38 72...
Страница 85: ...Everest XCR Product manual Installation INGENIA 2020 10 01 00 04 38 85...