EonStor S12F-R1432/G1433 Installation and Hardware Reference Manual
6.
Power on:
Once the components have been properly installed
and all cables are properly connected, you can power on the
subsystem and configure the RAID array. (See
Section 4.1
)
2.4.1 Installation Procedure Flowchart
The figure below shows a flowchart of the installation procedure. As
you complete each step, check off the “
Done
” box on the right.
Please use this flowchart in conjunction with the instructions that
follow.
Figure 2-1: Installation Procedure Flowchart
If you need to install the BBU, please do it after drive tray installation.
2.5
Unpacking the Subsystem
Compare the
Unpacking List
against the actual package contents to
confirm that all required materials have arrived. Carefully check the
items contained in each box before proceeding with installation.
NOTE:
Do not rely on the non-definitive, summarized unpacking list shown
below -- it is for reference only. A detailed unpacking list can be
found in your product shipping package or product CD.
Each shipping package is divided into the upper and lower levels.
Upper level box contents:
Twelve (12) drive trays
Lower level contents:
2-6
Содержание EonStor S12F-G1433
Страница 34: ...EonStor S12F R1432 G1433 Installation and Hardware Reference Manual This page is intentionally left blank 1 20...
Страница 110: ...EonStor S12F R1432 G1433 Installation and Hardware Reference Manual This page is intentionally left blank 5 24...
Страница 124: ...EonStor S12F R1432 G1433 Installation and Hardware Reference Manual B 8 Power Connectors IEC type receptacle B 8...