First Operation Check
35
iina
70
e 0
3
.f
m
te
chn
ica
l ha
nd
boo
k
(1
40
8)
After power on a welcoming picture appears on the screen of the control panel
/1, then status information on the speed of the turbo pump, the foreline pressure,
the emission and the active filament are given.
The start up procedure takes about 3 minutes and the end is indicated by a beep.
The UL1000 and UL1000 Fab is in Stand-by mode now.
4
Check if the inlet port
/2 is blanked off. If not, please mount a blind flange with
O-Ring on the inlet port.
5
Press the
/6. The inlet will be evacuated and the measured
leak rate will be displayed a moment later.
This is the measurement mode. If a test part was connected you would start spraying
Helium to identify leaks.
Fig. 3-1: Top view of the Standards
Pos. Description
Pos. Description
1
2