52
SmartNode Installation
Task
Verified by
Date
Network information available & recorded in Site Log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified
Table 10-1: Installation Checklist
10.11 Site Log
Inalp recommends you to maintain a site log to record all actions relevant to the system, if you do
not already keep such a log. Site log entries might include information as listed in Table 10-2.
1
Blank row for your special requirements.