background image

33

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

Programming menu

Menu item

Description

Adjustment range

Default value

Customised 

Value

P01 CH Set

This defines the boiler's flow temperature during heating

20 ÷ P02 °C

85

P02 Max CH Set

This defines the maximum settable flow temperature during 

heating

20 ÷ 95 °C

85

P03 Heating Hysteresis This defines the power-off hysteresis during the heating phase

2 ÷ 10 °C

5

P04 Anti-cycle CH

This is used to set a waiting time to avoid the boiler from 

switching on multiple times and frequently during CH mode

0 ÷ 15 minutes

3 minutes

P05 CH min time

This is the amount of time that the boiler needs to stabilise, 

when the burner runs at minimum power for the set amount 

of time

3 ÷ 10 minutes

3 minutes

P06 CH ramp

The amount of time that the boiler takes to reach the required 

temperature, number of degrees per minute (0 means no 

ramp)

0 ÷ 60 °C/minute

4 °C/minute

P07 CH post-

circulation

The amount of CH post circulation once the CH phase is 

finished

1 ÷ 30 minutes

3 minutes

P08 Available max 

heat out

This defines the maximum power percentage to be used 

during the set CH phase 

P09 ÷ 100%

100%

P09 Available max 

heat out

This defines the minimum power percentage to be used 

during the set CH phase 

0 ÷ P08%

0%

P10 -

Not used

14 l / minutes

P11 Electrodes anti-

humidity

This defines fan speed and operating mode, to avoid humidity 

inside the condensing module, which could otherwise 

cause the electrodes to malfunction (0 = disabled function, 

recommended value = 40) (RPM speed is calculated by 

multiplying the value displayed by 50)

P26 

÷

120

0

P12 P12Boiler’s 

modulation ratio 

It defines the boiler’s modulation ratio

(Do not modify)

÷ 

100%

10%

P13 Boiler power

Used to calculate the boiler power in the event of simple 

cascade. 

÷

 255 kW

80 kW = 75

100 kW = 90

120 kW = 115

P14 External probe 

curve

This is used to select the external probe operating curve 

(optional) (0 = disabled probe)

÷

 10

0

P15 External probe 

offset

This defines the CH offset in relation to the selected external 

probe curve

20 

÷

 70 °C

30 °C

P16 DHW set

This defines the DHW temperature

35 ÷ 65 °C

65 °C

P17 External D.H.W / 

3-waypump 

-    With a single boiler it controls an external 3-way. 

-    With single boiler and common flow probe, it lets you 

choose between an external D.H.W pump and a 3-way one.

-    With a simple cascade, it manages a D.H.W. pump 

(downstream an hydraulic separator).

0 = 3 Ways

1 = D.H.W. pump

P18 DHW hysteresis

This defines the DHW power-on hysteresis during CH

2 ÷ 10 °C

5 °C

P19 DHW post-

circulation

This is the post circulation time during DHW, once DHW 

production is finished

÷

 180 seconds

60 seconds

P20 Available max 

DHW pow

This defines the maximum power percentage to be used 

during the set DHW phase 

P21 

÷

 100 %

50 %

P21 Available max 

DHW pow

This defines the minimum power percentage to be used 

during the set DHW phase 

÷

 P20 %

0 %

P22

DHW flow 

temperature with 

thermostat

In combination with a storage tank and a separate thermostat, 

this defines the flow temperature during DHW operation

35 

÷

 90 °C

80 °C

P23 DHW modulation

Summed with the “Set San” (P16) parameter, this defines 

the flow temperature set that the boiler has to modulate the 

power on during DHW

÷

 30 °C

15 °C

P24 DHW off 

increment

This defines the time that the boiler allows the burner to 

switch off during DHW, by an increment of 5 °C on top of the 

flow temperature

÷

 255 seconds

60 seconds

P25 Max fan Speed

This defines the max fan speed and therefore the maximum 

relative boiler operating power (RPM speed is calculated by 

multiplying the value displayed by 50)

P26 

÷

 255 RPM 

x 50

80 kW Met. 132

80 kW LPG 131

100 kW Met. 134

100 kW LPG 127

120 kW Met. 140

120 kW LPG 140

Содержание Victrix Pro 100 2ErP

Страница 1: ...VICTRIX PRO 80 100 120 2 ErP IE Instruction and warning book 1 041665ENG...

Страница 2: ......

Страница 3: ...in the regulations in force and principles of good practice In compliance with legislation in force the systems must be designed by qualified professionals within the dimensional limits established b...

Страница 4: ...panel 23 2 5 Using the boiler 23 2 6 Troubleshooting 25 2 7 Info menu 27 2 8 Boiler shutdown 27 2 9 Restoring central heating system pressure 27 2 10 System drainage 27 2 11Anti freeze protection 27...

Страница 5: ...dequate support if inserted correctly according to technical standards in walls made of solid or semi hollow brick or block In the case of walls made from hollow brick or block partitions with limited...

Страница 6: ...l kits that can be potentially connected to the boiler must be protected on the basis of their electrical protection rating 1 5 ANTI FREEZE PROTECTION Minimum temperature 5 C The boiler comes standard...

Страница 7: ...tanks in case of supply from LPG depot New LPG storage tanks may contain residual inert gases nitrogen that degrade the mixture delivered to the appliance causing problems with boiler operation Due t...

Страница 8: ...tem as specified by current safety standards Attention Immergas S p A declines any respon sibility for damage or physical injury caused by failure to connect the boiler to an efficient earth system or...

Страница 9: ...at the On Off thermostat contact is of the clean type i e independent of the mains voltage otherwise the P C B would be damaged Cascade and zone regulator must be connected through clamps 37 and 38 to...

Страница 10: ...chamber and fan assisted The boiler leaves the factory with B23 configuration to change the configuration of the boiler to type C sealed chamber and fan assisted disassemble the 80 adapter the bracke...

Страница 11: ...1 3 m Terminal complete with vertical ex haust 80 Exhaust m 3 DUCT TYPE Equivalent length in m of concentric pipe 80 125 Concentric pipe 80 125 m 1 1 0 m Concentric bend 90 80 125 1 9 m Concentric ben...

Страница 12: ...er to ensure sufficient space to carry out the tests required by law upon commissioning External grid The intake exhaust terminal if properly installed is pleasant to look at on the outside of the bui...

Страница 13: ...he lid using the previously disassembled sheet steel plate 3 Installation of the fake aluminium tile replace the tiles with the aluminium sheet 5 shaping it to ensure that rainwater runs off Position...

Страница 14: ...ith this configuration can be extended up to a max measurement of 28 0 m with Victrix Pro 80 2ErP 14 0 m with Victrix Pro 100 2ErP and 8 5 m with Victrix Pro 120 2ErP including the terminal Using the...

Страница 15: ...late has been fitted This will ensure sealing and joining of the elements making up the kit Horizontal kit 80 with exhaust in flue Kit assembly Fig 1 21 install the 80 bend 1 with the male side smooth...

Страница 16: ...rent technical regulations in particular the declaration of conformity must be compiled at the end of work and on commissioning of the ducted system The instructions in the project or technical report...

Страница 17: ...In domestic hot water mode the circulator pump always runs at maximum speed Pump release If after a prolonged period of inactivity the circulation pump is blocked unscrew the front cap and turn the mo...

Страница 18: ...A B INSTALLER USER MAINTENANCE TECHNICIAN Head available to the system Head kPa Head kPa Flow rate l h Flow rate l h Key A Available head B Power absorbed by the circulator pump dotted area Circulato...

Страница 19: ...e 10 Flue probe 11 Condensation module 12 Air pressure switch 13 Fumes hood 14 Air intake pipe 15 Igniter 16 Heat exchanger safety thermostat manual reset 17 Heat exchanger safety thermal fuse 18 Igni...

Страница 20: ...d block circuit breaker switches andofthethermometer notsuppliedasstandard with the boiler must be set up as described in the installation instructions in compliance with theprovisionsofthe R collecti...

Страница 21: ...tral heating circuit pump CMI 1 13 Zone 2 central heating circuit pump CMI 2 14 Zone 3 direct circuit pump CD 15 Storage tank unit feeding pump 16 Zone 1 safety thermostat CMI 1 17 Zone 2 safety therm...

Страница 22: ...orary shutdown of the boiler is required proceed as follows a drain the heating system if anti freeze is not used b shut off all electrical water and gas supplies N B in the case of maintenance interv...

Страница 23: ...indicates a base value at which the system has been designed and calculated and however not less than 0 5 bar Open the gas cock upstream from the boiler Turn the main switch and the boiler runs a self...

Страница 24: ...5 2 6 DHW exclusion with the boiler set up for DHW heating press C momentarily to exclude DHW heating mode operation To restore DHW heating press C again Anomaly records press and hold C down to acce...

Страница 25: ...t During boiler operation the board does not detect a change in the flow NTC probe temperature The error may be caused by a poor thermal probe contact or a system with excessive thermal inertia Press...

Страница 26: ...rn temperatures The error may be caused by a failure in one of the two probes 2 1 0E98 Simple cascade com munication anomaly Occurs if the communication between the display boards breaks down Check th...

Страница 27: ...drained completely or antifreeze substances must be added to the heating system water In systems that are drained frequently filling must be carried out with suitably treated water to eliminate hardn...

Страница 28: ...ction ing of fans check that the intake and or exhaust terminals are not blocked ensure activation of all adjustment devices seal the gas flow rate regulation devices if settings are modified check se...

Страница 29: ...Main switch X90 Boiler configuration jumper Y1 Gas valve Configure the corresponding parameters when connecting in simple cascade or when con necting in system side flow probe or D H W pump 1 Externa...

Страница 30: ...DIAGRAM Key A2 Electronic board A4 Display board B1 Flow probe B1 2 System side flow probe optional B2 Domestic hot water probe optional B4 External temperature probe optional B5 Return probe B10 Flue...

Страница 31: ...probe NTC B2 Domestic hot water probe NTC B4 External probe M2 Plant CH pump M30 3 way valve Note probe B1 2 B2 B4 Connection cable diameter 3 7 mm Cable section 0 5 1 5 mm2 1 External relay optional...

Страница 32: ...tage of CO2 in flue gases The over temperature safety thermostat the flow probe or the return probe are triggered frequently It can depend on the lack of water in the boiler little water circulation i...

Страница 33: ...ower in the event of simple cascade 0 255 kW 80 kW 75 100 kW 90 120 kW 115 P14 External probe curve This is used to select the external probe operating curve optional 0 disabled probe 0 10 0 P15 Exter...

Страница 34: ...31 Unit of measurement This defines the unit of measure on the display whether metric or Imperial 0 127 C kW 128 256 F kBTu h 0 P32 Set Resc Min Limits the minimum value of the heating set The paramet...

Страница 35: ...ler adjustment operations must be carried out by a qualified technician e g Immergas After Sales Assistance 3 12 ADJUSTMENT OF THE AIR GAS RATIO Calibration of minimum CO2 Turn the boiler on and start...

Страница 36: ...e request is deactivated below 1 V Notes If P37 is set at 0 it is not active when the boiler is in stand by or summer mode The calculated set is limited by the P02 20 C range Themaximumandminimumtempe...

Страница 37: ...replaced at least every two years regardless of their state of wear Check that the burner is intact that it has no deformations or cuts and that it is properly fixed to the combustion chamber lid oth...

Страница 38: ...to de tach it from the central hooks and then slide it downwards take the two clamping screws out 4 from the control panel with their rings 5 press the two side hooks 7 and tilt the control panel 6 re...

Страница 39: ...39 3 15 1 6 8 9 9 12 12 10 11 13 13 13 13 A A Rif A 7 7 INSTALLER USER MAINTENANCE TECHNICIAN Ref A...

Страница 40: ...03 5620 61 0 52460 6 63 5550 4 87 5440 59 0 50740 6 42 5380 4 71 5270 57 0 49020 6 20 5210 4 55 5090 55 0 47300 5 98 5040 4 39 4920 53 0 45580 5 76 4880 4 23 4750 51 0 43860 5 55 4710 4 07 4580 49 0 4...

Страница 41: ...230 6 68 5930 81 0 69660 8 78 6000 6 44 5730 78 0 67080 8 45 5780 6 20 5530 75 0 64500 8 12 5560 5 96 5320 72 0 61920 7 79 5340 5 72 5130 69 0 59340 7 47 5120 5 48 4930 66 0 56760 7 14 4910 5 24 4730...

Страница 42: ...63 0 54180 6 83 4100 5 01 4000 60 0 51600 6 51 3930 4 78 3830 57 0 49020 6 18 3760 4 54 3660 54 0 46440 5 86 3590 4 30 3490 51 0 43860 5 54 3430 4 06 3330 48 0 41280 5 21 3260 3 83 3160 45 0 38700 4 8...

Страница 43: ...mbar mm H2 O 20 204 37 377 Flue flow rate at nominal heat output kg h 146 148 Flue flow rate at min heat output kg h 16 16 CO2 at Q Nom Min 9 40 9 00 10 60 10 10 CO with 0 O2 at Nom Min Q Nom Min ppm...

Страница 44: ...07 6 107 2 107 5 Heat loss at casing with burner On Off 80 60 C 0 34 0 80 0 41 0 60 0 28 0 70 Heat loss at flue with burner On Off 80 60 C 0 01 2 2 0 01 1 9 0 01 2 0 Central heating circuit max operat...

Страница 45: ...Md Model code Sr N Serial Number CHK Check Cod PIN PIN code Type appliance configuration ref CEN TR 1749 Qnw min Minimum DHW heat input Qn min CH minimum heat input Qnw max DHW maximum heat input Qn...

Страница 46: ...60 C on return and 80 C on flow Low temperature mode for condensation Boilers means 30 C for low temperature boilers 37 C and for other appliances 50 C of return temper ature Model s Victrix Pro 100...

Страница 47: ...a low temperature mode P1 33 3 kW At 30 of nominal heat output in a low temperature mode 1 96 5 Auxiliary electricity consumption Other items At full load elmax 0 190 kW Heat loss in standby Pstby 0 1...

Страница 48: ...mmergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 041665ENG rev ST 003520 000 08 18 Inglese p...

Отзывы: